製品
商品の詳細
ホーム > 製品 >
Fast Construction Prefabricated Steel Frame Dormitory Short Project Delivery Period

Fast Construction Prefabricated Steel Frame Dormitory Short Project Delivery Period

MOQ: 500平方メートル
価格: USD 40-60 / sqm
標準パッケージ: フィクスチャを備えたスチールパレットに詰められ、40'hq/otに積み込まれた
配達期間: ショップ描画の4〜6週間後に承認を得ます
支払方法: T/T
供給容量: 1か月あたり100000sqm
詳細情報
起源の場所
中国山東省
ブランド名
TISIN
証明
ISO, CE, SGS
モデル番号
ティシンビル
接続タイプ:
ボルト締め、溶接
ターンキー プロジェクト:
許容できる
屋根斜面:
シングル/ダブル/マルチスロープ
サイズ:
カスタマイズサイズ
断熱材:
EPS,ガラスワール,ロックワール,PU (PIR)
寸法:
お客様のご要望
ウォールパーリン:
C / Z パーリン
ハイライト:

prefabricated steel frame dormitory

,

fast construction steel building

,

short delivery period steel structure

製品の説明
Fast Construction Prefabricated Steel Frame Dormitory Short Project Delivery Period
1. Product Description

Fast Construction Prefabricated Steel Frame Dormitory is a standardized modular housing solution built with lightweight steel frame as the main load-bearing system. It features ultra-short delivery cycle, easy assembly, stable structural performance and flexible layout, which has become the mainstream temporary and permanent accommodation for various industries. Different from traditional brick-concrete dormitories with long construction cycles and complicated on-site civil work, this prefab steel dormitory adopts fully factory prefabricated mode. All main steel frames, wall panels, roof panels, floor slabs, doors, windows and internal accessories are manufactured and assembled inside the workshop, then transported to the construction site for quick splicing installation. The whole project can be finished within 3 to 10 days according to different building scales, greatly shortening the overall project delivery period.

The main bearing frame of the dormitory adopts national standard light H-beams, channel steel and angle steel, with high tensile strength and strong structural stability. The overall structure has excellent anti-seismic, wind-resistant and snow-resistant performance, which can adapt to harsh environments such as coastal windy areas, cold high-altitude regions and rainy humid zones. The enclosure system uses fireproof color steel sandwich panels with rock wool or glass wool as core material, which integrates heat insulation, sound insulation, fire prevention and waterproof functions. Each dormitory unit can be independently divided into bedroom, washroom, aisle and public activity area, equipped with complete supporting facilities including lighting, power circuit, ventilation windows, anti-theft doors and stair railings. Customers can customize the number of floors, single room size, indoor layout, color of wall panels and external auxiliary facilities according to actual demand.

This prefabricated steel frame dormitory is highly reusable and removable. If the project site needs to be relocated, all steel components can be disassembled completely without damage, and reassembled on another construction site, effectively reducing repeated construction costs and construction waste. Under regular maintenance, the service life of the whole dormitory can reach more than 30 years. Compared with concrete buildings, it greatly reduces the demand for foundation treatment because of its light self-weight, which cuts down foundation construction cost and time. The core advantage of short project delivery period makes it the priority choice for customers who need to put accommodation into use urgently.

Fast Construction Prefabricated Steel Frame Dormitory Short Project Delivery Period 0

Fast Construction Prefabricated Steel Frame Dormitory Short Project Delivery Period 1

2. Complete Production Process

The production of prefabricated steel frame dormitory follows standardized industrial assembly lines, covering eight core links to guarantee processing precision and product quality.

  1. Customized Drawing Design
    After receiving customer orders, technical engineers confirm parameters including building size, floor quantity, wind load, snow load and local construction standards. 3D structural models and detailed component processing drawings are produced. All details such as steel frame specification, wall panel thickness, circuit layout and bathroom structure are confirmed with clients before mass production.
  2. Raw Material Inspection and Preparation
    Qualified raw materials including hot rolled steel profiles, galvanized steel sheets, rock wool core materials, hardware bolts and window frames are purchased. The factory conducts strict material testing on yield strength, thickness, fire resistance and corrosion resistance. Any unqualified raw materials will be rejected to avoid hidden structural dangers.
  3. CNC Automatic Cutting and Blanking

    Steel beams, columns and auxiliary keels are cut by CNC cutting machines with millimeter-level precision. The cutting surface is smooth without burrs to ensure seamless assembly in later stages.

    Fast Construction Prefabricated Steel Frame Dormitory Short Project Delivery Period 2

  4. Welding and Deformation Correction
    Professional certified welders carry out full welding on steel frame joints following international steel structure welding standards. Virtual welding, missing welding and cracks are strictly prohibited. After welding, straightening equipment is used to eliminate thermal deformation, ensuring the verticality and flatness of all load-bearing frames.
  5. Surface Anti-corrosion Treatment
    This link includes multiple surface treatment processes which will be elaborated separately in the next chapter. All steel components are polished and derusted first, then covered with protective layers to resist rust and oxidation.
  6. Enclosure and Internal Component Processing
    Workers produce color steel wall panels, roof panels, floor slabs, prefabricated toilet modules, door and window frames, stair handrails and electrical wire slots in independent production areas. All accessories are matched with main steel frame sizes for integrated installation.
  7. Factory Pre-assembly Inspection
    A complete trial assembly of one or multiple dormitory units is finished inside the factory. Inspectors check frame stability, panel splicing tightness, circuit smoothness and safety protection facilities. Defective parts are adjusted and replaced before packaging to eliminate on-site assembly errors.
  8. Classification Packaging and Delivery
    All disassembled components are marked with serial numbers according to assembly sequence, wrapped with protective films and fixed with wooden frames to prevent collision damage during transportation. Complete installation drawings and spare bolt kits are loaded together for delivery.Fast Construction Prefabricated Steel Frame Dormitory Short Project Delivery Period 3
3. Steel Component Surface Treatment

Surface treatment determines the dormitory’s anti-rust performance and service life. Three mainstream treatment processes are available for customers to select based on service environment and budget.

  1. Sand Blasting + Primer + Topcoat Spraying
    First, sand blasting removes rust, oxide scale and oil stains on steel surfaces to form rough matte texture for strong paint adhesion. Then anti-rust primer is sprayed as the bottom protective layer, and weather-resistant topcoat is sprayed on the outer layer. This process is cost-effective for temporary construction sites with dry climate. It can effectively slow down surface oxidation and support repainting after several years of use.
  2. Hot-dip Galvanizing Treatment
    Steel frames are immersed in high-temperature molten zinc liquid after derusting. A thick zinc alloy protective layer forms on all steel surfaces, including internal corners and welding gaps. Hot-dip galvanizing provides superior anti-corrosion performance, suitable for coastal areas with high salt fog, rainy humid regions and long-term permanent dormitories. The anti-rust period can reach 15 to 20 years without secondary maintenance.
  3. Electro-galvanizing + Finish Paint
    Electro-galvanizing forms a thin uniform zinc layer on steel surfaces, followed by decorative topcoat for neat appearance. This treatment is widely used for secondary small accessories such as guardrails, stair supports and connecting keels, balancing anti-corrosion effect and beautiful appearance.

For wall and roof color steel panels, the surface adopts polyester coated galvanized steel plate, with anti-ultraviolet, anti-fading and waterproof performance, which will not crack or peel under long-term outdoor exposure.

Fast Construction Prefabricated Steel Frame Dormitory Short Project Delivery Period 4

4. Application Scenarios
  1. Construction Site Staff Dormitory
    This is the most common application. Engineering teams need batch accommodation for construction workers in a short time. The short delivery period allows the dormitory to be put into use within one week after factory production, and it can be dismantled and transferred along with project progress.
  2. Factory Staff Living Quarters
    Medium and large factories build permanent or semi-permanent dormitory buildings for production line workers. The steel frame structure saves land cost, and the thermal insulation sandwich panels create comfortable living space. Independent toilet and balcony layout meet long-term living demands.
  3. Mining and Oil Field Camps
    Mining areas, oil and gas exploration bases are usually located in remote wild areas with harsh weather. The prefab steel dormitory has strong wind, snow and seismic resistance, and all components are convenient for long-distance transportation to remote zones.
  4. Campus Temporary Teaching & Dormitory Buildings
    When schools expand enrollment or carry out campus reconstruction, temporary student dormitories and staff rest rooms can be quickly built to solve the urgent housing shortage without waiting for long concrete construction cycles.
  5. Post-disaster Emergency Resettlement Housing
    After floods, earthquakes and other natural disasters, the government needs rapid emergency accommodation for affected residents. The ultra-short production and installation cycle of prefabricated steel dormitories can complete resettlement construction within several days.
  6. Scenic Area Staff Accommodation
    Tourist attractions build simple dormitories for service staff. The steel dormitory can be designed with appearance matching scenic style, and it can be disassembled when scenic area planning is adjusted.

    Fast Construction Prefabricated Steel Frame Dormitory Short Project Delivery Period 5

5. Frequently Asked Questions (FAQ)
Q1: How short is the project delivery period of your prefabricated steel frame dormitory?
A1: The production cycle for a single standard dormitory unit is 2 to 4 working days. For projects with 10 to 30 units, the whole factory production can be finished within one week. On-site installation only takes 1 to 5 days depending on construction scale. The total delivery period is far shorter than brick and concrete buildings which need 1 to 3 months.
Q2: Is the steel dormitory safe for long-term living?
A2: Absolutely safe. The main steel frame meets international building load standards, with strong seismic and wind resistance. The wall panels use Class A fireproof rock wool core to stop fire spread. All circuits are embedded with fire-proof wire slots, and anti-slip floors and safety guardrails are equipped to eliminate daily living risks. The service life can reach over 30 years with proper maintenance.

Fast Construction Prefabricated Steel Frame Dormitory Short Project Delivery Period 6

Q3: Can the dormitory be customized in size and layout?
A3: Full customization is supported. We adjust single room width, length, floor height, floor quantity, bathroom quantity, public kitchen and activity area layout according to customer requirements. Customers can also choose wall panel colors, door styles, window sizes and external sunshade structures.
Q4: Can the dormitory be disassembled and reused after project completion?
A4: Yes. All connections adopt high-strength bolt assembly without concrete pouring or welding fixation on site. The whole building can be fully disassembled, transported and reassembled on new sites without major component damage, which greatly reduces repeated housing investment.
Q5: What surface anti-corrosion options can I choose for steel frames?
A5: Three optional treatments: spray paint system for temporary low-budget projects; electro-galvanizing for small decorative components; hot-dip galvanizing for coastal, humid and long-term permanent dormitories with top anti-rust performance.
Q6: Does the dormitory have good thermal insulation and sound insulation effect?
A6: The wall and roof adopt 50mm/75mm/100mm thick rock wool sandwich panels. Rock wool core material effectively blocks heat transfer and noise transmission, keeping indoor warm in winter and cool in summer, and isolating outdoor noise for quiet rest environment.
Q7: What foundation does this steel dormitory need?
A7: Thanks to light self-weight, it does not require deep reinforced concrete foundation. Simple flat cement ground or strip foundation can meet the installation demands, saving foundation construction time and cost by more than 60% compared with traditional buildings.

Fast Construction Prefabricated Steel Frame Dormitory Short Project Delivery Period 7

Closing Summary

Fast Construction Prefabricated Steel Frame Dormitory with short project delivery period integrates efficiency, safety, environmental protection and reusability. Supported by mature standardized production lines, multiple reliable surface anti-corrosion processes and flexible customized design, it covers temporary and permanent accommodation demands from construction, industry, mining, education, emergency relief and tourism industries. With extremely short production and installation cycle, stable structural performance and low comprehensive cost, it becomes the most cost-effective housing solution for global customers who need fast delivery of dormitory projects.

Fast Construction Prefabricated Steel Frame Dormitory Short Project Delivery Period 8

Please get in contact with us for feasible construction plan and price negotiation.