Products
Contact Us
Contact Now
Prefab Steel Structure Workshop Industrial Design Style For Hall Workshop Factory
| MOQ: | 1000 sqm |
| Price: | USD 40-60 / sqm |
| Standard Packaging: | Packed on steel pallet with fixture and loaded into 40'HQ/OT |
| Delivery Period: | 6 weeks after shop drawing get approval |
| Payment Method: | T/T,L/C |
| Supply Capacity: | 100,000 sqm / month |
Detail Information
Place of Origin
Shandong, China
Brand Name
TISIN
Certification
ISO, CE, SGS
Type:
Portal Frame Structure
Drawing Design:
SketchUP/AutoCAD/PKPM/3D3S/TEKLA
Main Frame:
Welded H-shape Steel Beam
Material:
Q235B/Q355B Steel
Welding Method:
SAW, MIG,GMAW
Surface Treatment:
Sand Blasing Sa2.5 + Anti Corrosive Paint
Life Time:
Main Structure 35-50 Years
Delivery Time:
30-45 Days
Highlight:
prefab steel structure Workshop
,Industrial prefab steel structure
,Factory pre built steel garage
Product Description
Wholesale Prefab Steel Structure Workshop Industrial Design Style
Product Attributes
| Attribute | Value |
|---|---|
| Type | Portal Frame Structure |
| Drawing design | SketchUP/AutoCAD/PKPM/3D3S/TEKLA |
| Main frame | Welded H-shape Steel Beam |
| Material | Q235B/Q355B Steel |
| Welding method | SAW, MIG, GMAW |
| Surface treatment | Sand blasting Sa2.5 + Anti corrosive paint |
| Life Time | Main Structure 35-50 Years |
| Delivery Time | 30-45 Days |
Product Description
The Customized Steel Structure Workshop Building with a prefabricated delivery solution utilizes steel to create a robust load-bearing structure. This main frame consists of beams and columns, supported by a comprehensive bracing system that includes tie bars, knee bracing, stay bars, column bracing, and horizontal bracing. Together with the roof, wall, and floor systems, these components form a complete metal structure.
Advantages Over Traditional Concrete Buildings
Metal workshop buildings employ steel plates or sectional steel instead of reinforced concrete, resulting in:
- Higher Strength: Enhanced load-bearing capacity and structural integrity.
- Improved Seismic Resistance: Better performance in seismic conditions.
- Reduced Construction Time: Most components are prefabricated in factories, allowing for quick on-site assembly.
- Environmental Sustainability: The reusability of steel significantly reduces construction waste, making these structures more eco-friendly.
Specification
| Dimension | Length x Width x Eave height/ Ridge height |
| Frame type | Portal frame, multi-story frame |
| Main frame | Hot-rolled or Welded H beam and column, Q355B steel |
| Bracing components | Tie bar, staying bar, Horizontal bracing, Column bracing |
| Cladding system | Corrugated color steel sheet, sandwich panel with glass wool, rock wool, PU insulation |
| Accessory | Ridge tile, trim, Gutter, Down pipe, skylight, clerestory |
| Door | Sliding door, Roll up door, industrial section door, swing door |
| Window | PVC window, aluminum window, metal louver |
Advantages of Steel Structure Workshop
- Easy to assemble: Prefabricated components arrive ready for quick on-site assembly following precise installation drawings.
- Reasonable cost: Lightweight design reduces foundation costs while fast construction enables quicker production startup.
- Simple construction, short construction period: Factory prefabrication allows a 4000m² building to be installed in approximately 40 days.
- Energy-saving and environmentally friendly: Uses dry construction methods and energy-efficient materials to minimize environmental impact.
Design Important Factors
1. Reasonable column spacing: Typically 6.8m to 9m for optimal steel usage and cost efficiency, adjustable for special requirements.
2. Proper lighting and ventilation design: Incorporates roof ventilators and strategically placed windows to address the challenges of large-span spaces.
Difference Between Metal Structure and Concrete Building
- Short construction period: Factory prefabrication enables rapid on-site assembly with minimal welding required.
- Environmental Friendly: Dry construction process eliminates water usage and reduces dust pollution.
- Favorable Cost: Typically 20-30% lower total cost than concrete buildings with superior durability.
- Structure Weight: Significantly lighter than traditional brick-concrete construction.
Why Choose TISIN
With nearly 20 years of experience, we has successfully implemented hundreds of projects worldwide. Our professional engineering team provides complete solutions for:
- Pre-Engineered Steel Buildings
- Buildings For Heavy Industry
- Buildings for commodity industry
- Industrial Steel Structures
Project Gallery
We have exported to many countries including: Australia, PNG, Fiji, Samoa, Indonesia, Philippines, Malaysia, Maldives, Ghana, Mauritius, Benin, Rwanda, Ethiopia, Cameroon, Tanzania, Angola, Nigeria, Madagascar, Seychelles, Chile, Columbia, Paraguay, Venezuela, Costa Rica, Guyana.
Overall Rating
5 star
100%
4 star
0
3 star
0
2 star
0
1 star
0
All Reviews
-
TThe first time i have installed the steel structure, Lyne helped me communicate with their engineers and provided drawings for each installation step. Also help me save sea freight by checking with different shipping companies, really thanks for your service and help.
-
BHigh quality products, trusty supplier, strongly recommend
-
MQuick and professional response, Look forwad next job.