products
PRODUCTS DETAILS
Home > Products >
Offices Prefabricated Steel Frame Building For Agriculture Barn Storage Cow Shed

Offices Prefabricated Steel Frame Building For Agriculture Barn Storage Cow Shed

MOQ: 1000 sqm
Price: USD 40-60 / sqm
Standard Packaging: Packed on steel pallet with fixture and loaded into 40'HQ/OT
Delivery Period: 6 weeks after shop drawing get approval
Payment Method: T/T,L/C
Supply Capacity: 100,000 sqm / month
Detail Information
Place of Origin
Shandong, China
Brand Name
TSIN-PH-Frame BL 06
Certification
ISO, CE, SGS
Model Number
TSIN
Application Fields:
Offices, Shopping Malls, And Hotels ,Apartments Or Mixed-use Buildings,Hospitals, Schools, And Government Buildings
Maximum Roof Load (lb./sq.ft):
20+lb/sq.ft
Window::
Aluminiumn Alloy Window/ PVC Window/ Sandwich Panel Window/louvers
Panel::
Sandwich Panel/ Corrugated Steel Sheet
Working Scope::
Design,Fabrication, Installation
Resist Rust:
Two Lays Of Anti-rust Painting Or Hot Dip Galvanized
Highlight:

Offices prefabricated steel frame building

,

shopping malls prefabricated steel frame building

,

hotels prefabricated steel frame homes

Product Description
Simple Assembled Steel Frame building for Agriculture barn Storage Cow shed
Steel Frame Buildings

.Steel structure warehouses are industrial storage facilities built with steel as the primary structural material, valued for their strength, versatility, and cost-effectiveness. They are widely used in logistics, manufacturing, agriculture, and retail for storing goods, equipment, or raw materials.

Technical Specifications
  • Dimension: Length x width x Eave height, roof slope
  • Type: Single slope, double slope, multi-slope; Single span, double-span, multi-spans; Single floor, double floors, multi-floors
  • Foundation: Concrete and steel foundation bolts
  • Column and beam: Hot rolled or welded H steel Q355B, all high strength bolts connection
  • Bracing: X or V type bracing made from angle steel or steel pipe
  • Purlin: Q235B C/Z section steel with size C160-300 or Z160-300
  • Roof and wall panel: Single colorful corrugated steel sheet or sandwich panel with insulation
  • Surface treatment: Painting or hot dip galvanized
Key Performance Advantages
  • High Strength-to-Weight Ratio: Lighter yet robust frameworks reduce foundation loads while supporting multiple floors
  • Design Flexibility: Enables open floor plans, large spans, and creative architectural features
  • Rapid Construction: Prefabricated components shorten build times by 20-40% compared to concrete
  • Durability & Resilience: Resists environmental wear, fire (when fireproofed), and seismic activity
  • Sustainability: 100% recyclable material with reduced waste and energy-efficient upgrade potential

Application of  Steel frame

Offices Prefabricated Steel Frame Building For Agriculture Barn Storage Cow Shed 0

Offices Prefabricated Steel Frame Building For Agriculture Barn Storage Cow Shed 1

 

 
Packaging and Quality Control

Our comprehensive quality control measures include:

  • Pre- and post-fabrication material inspections
  • Precision measuring, cutting and welding
  • Accurate hole and cleat placement
  • Careful packaging and loading sequence

Offices Prefabricated Steel Frame Building For Agriculture Barn Storage Cow Shed 2

Offices Prefabricated Steel Frame Building For Agriculture Barn Storage Cow Shed 3

Frequently Asked Questions
Q1: Can I visit your factory before ordering?
A: Yes, we welcome factory visits. We can arrange airport pickup and hotel booking services.
Q2: What is your project cooperation process?
A: Our process includes project consultation, free design service, contract signing, production, and optional installation support.
Q3: What is the price range for steel structures?
A: Prices vary from $19 to $100+ per square meter depending on material quality, size, and design complexity.
Q4: Do you provide installation services?
A: We provide detailed construction manuals and can send engineers for on-site installation support (costs covered by buyer).
Q5: What is your standard delivery time?
A: Typically 30 days after deposit, with partial shipment available for large orders.
Why our prices are higher: We use premium steel from major mills, smarter designs that balance safety and economy, and durable high-grade components that last 10-20 years. We prioritize long-term value over low initial prices.