products
PRODUCTS DETAILS
Home > Products >
Large Span Modern Steel Frame Building Industrial Workshop Poultry House

Large Span Modern Steel Frame Building Industrial Workshop Poultry House

MOQ: 1000 sqm
Price: USD 40-60 / sqm
Standard Packaging: Packed on steel pallet with fixture and loaded into 40'HQ/OT
Delivery Period: 6 weeks after shop drawing get approval
Payment Method: T/T,L/C
Supply Capacity: 100,000 sqm / month
Detail Information
Place of Origin
Shandong, China
Brand Name
TSIN
Certification
ISO, CE, SGS
Model Number
TSIN
Warranty:
5 Years
Maintenance Costs:
Reduced
Labor Costs:
Lower
Connection:
Bolts
Insulation:
EPS, Glasswool, Rockwool, PU On Option
Thickness Of Panel:
50mm, 75mm, 100mm, 150mm, 200mm, 250mm
Using Life:
50 Years
Product:
Steel Structure
Material Grade:
Q355B, Q235B
Structure Type:
Portal Frame
Design Load:
Wind, Snow, Seismic
Design Software:
PKPM, Tekla Structures, CAD
Sand Blasting:
Sa 2.5
Surface Treatment:
Anti-corrosive Paint Or Hot Dipped Galvanized
Highlight:

Large Span prefabricated steel building

,

Modern steel frame building

,

prefabricated steel structure

Product Description
Large Span Modern Steel Frame Building Industrial Workshop Poultry House
Product Attributes
AttributeValue
Warranty5 Years
Maintenance CostsReduced
Labor CostsLower
ConnectionBolts
InsulationEPS, Glasswool, Rockwool, PU On Option
Thickness Of Panel50mm, 75mm, 100mm, 150mm, 200mm, 250mm
Using Life50 Years
ProductSteel Structure
Material GradeQ355B, Q235B
Structure typePortal frame
Design LoadWind, Snow, Seismic
Design softwarePKPM, Tekla structures, CAD
Sand blastingSa 2.5
Surface treatmentAnti-corrosive paint or hot dipped galvanized
Modern Prefabricated Steel Building

Engineered for easy assembly and recyclability, making it an ideal option for industrial warehouses, offices, and residential applications. Constructed from high-quality steel, it features a robust load-bearing main frame composed of beams and columns.

Structural Components

This building includes a comprehensive bracing system to ensure stability and durability:

  • Tie bars
  • Knee bracing
  • Stay bars
  • Column bracing
  • Horizontal bracing

These components work seamlessly with precision-engineered roof, wall, and floor systems to create a reliable and resilient metal structure.

Advantages Over Traditional Concrete Buildings
  • Superior Strength: Constructed with steel plates or sectional steel, the structure offers enhanced structural integrity and improved seismic resistance.
  • Faster Construction: Prefabricated components enable quick on-site assembly, significantly reducing construction time.
  • Sustainability: Steel is both reusable and recyclable, minimizing construction waste and supporting environmentally friendly practices.
Large Span Modern Steel Frame Building Industrial Workshop Poultry House 0
Large Span Modern Steel Frame Building Industrial Workshop Poultry House 1
Large Span Modern Steel Frame Building Industrial Workshop Poultry House 2
Product Specifications
ProductsSteel Structure Warehouse
Frame typePortal frame, multi-story frame
Main frameHot-rolled or Welded H beam and column, Q355B steel
Bracing componentsTie bar, staying bar, Horizontal bracing, Column bracing
Cladding systemSandwich panel with glass wool, rock wool, PU insulation, Corrugated color steel sheet
AccessoryRidge tile, trim, Gutter, Down pipe, skylight, clerestory
DoorRoll up door, industrial section door, swing door, Sliding door
WindowPVC window, aluminum window, metal louver
Large Span Modern Steel Frame Building Industrial Workshop Poultry House 3
Large Span Modern Steel Frame Building Industrial Workshop Poultry House 4
Advantages of Steel Structure Buildings
Easy to Assemble

Prefabricated steel components are installed on-site following detailed drawings. The assembly process includes erecting steel columns with cross-bracing, roof beams with horizontal bracing, and installing purlins and enclosure panels, ensuring efficient and precise construction.

Cost-Effectiveness

Steel's lightweight nature reduces foundation costs, while the rapid construction timeline enables earlier project completion and operation. Overall, steel structures provide better economic value compared to traditional concrete buildings.

Simplified Construction with Short Timelines

Factory-produced components are delivered and quickly assembled on-site, drastically reducing build times. A typical steel structure can often be completed within weeks.

Energy-Efficient & Eco-Friendly

Using corrugated color steel sheets and sandwich panels enhances insulation and energy savings. Dry construction methods minimize dust and pollution, while steel's recyclability further lessens environmental impact.

Differences Compared to Concrete Buildings
  • Shorter Construction Period: Prefabricated steel components require minimal on-site welding, resulting in significantly faster build times than concrete structures.
  • More Environmentally Friendly: Steel construction eliminates water use during assembly, reducing dust and pollution in the surrounding environment.
  • Better Cost Performance: Faster construction reduces labor costs, with total expenses typically 20-30% lower than traditional concrete buildings. Additionally, steel offers superior durability.
  • Lighter Structure: Lightweight metal walls and roofs greatly reduce the overall structural weight, easing foundation loads compared to brick or concrete alternatives.
Large Span Modern Steel Frame Building Industrial Workshop Poultry House 5
Large Span Modern Steel Frame Building Industrial Workshop Poultry House 6
Frequently Asked Questions
1. What materials are used in your steel structure buildings?

Our steel structure buildings mainly use high-quality H-section steel, I-section steel, color steel plates and sandwich panels with reliable performance and durability.

2. What certifications do your steel structure buildings have?

Our products have passed ISO 9001 quality management system certification and CE certification to meet international standards and can be customized according to different market requirements.

3. How long is the construction period of a steel structure building?

The construction period depends on the size and complexity. Generally, a 4,000 square meter building can be completed in about 40 days due to prefabricated components.

4. Can steel structure buildings be customized according to needs?

Yes, we can customize the design, size, and configuration of steel structure buildings according to customers' specific usage scenarios and functional requirements.

5. Do you provide installation guidance for steel structure buildings?

We provide detailed installation drawings and instructions. For large projects, we can also send professional engineers to the site for guidance to ensure smooth installation.