products
PRODUCTS DETAILS
Home > Products >
Prefabricated Steel Frame Building Warehouse Workshop Portal Frame

Prefabricated Steel Frame Building Warehouse Workshop Portal Frame

MOQ: 1000 sqm
Price: USD 40-60 / sqm
Standard Packaging: Packed on steel pallet with fixture and loaded into 40'HQ/OT
Delivery Period: 6 weeks after shop drawing get approval
Payment Method: T/T,L/C
Supply Capacity: 100,000 sqm / month
Detail Information
Place of Origin
Shandong, China
Brand Name
TSIN
Certification
ISO, CE, SGS
Model Number
TSIN
Warranty:
5 Years
Maintenance Costs:
Reduced
Labor Costs:
Lower
Connection:
Bolts
Insulation:
EPS, Glasswool, Rockwool, PU On Option
Thickness Of Panel:
50mm, 75mm, 100mm, 150mm, 200mm, 250mm
Using Life:
50 Years
Product:
Steel Structure
Material Grade:
Q355B, Q235B
Structure Type:
Portal Frame
Design Load:
Wind, Snow, Seismic
Design Software:
PKPM, Tekla Structures, CAD
Sand Blasting:
Sa 2.5
Surface Treatment:
Anti-corrosive Paint Or Hot Dipped Galvanized
Highlight:

50mm prefabricated steel building

,

100mm steel frame building

,

150mm prefabricated steel structure

Product Description
Prefabricated Steel Frame Building Warehouse Workshop
Key Specifications
Attribute Value
Warranty 5 Years
Maintenance Costs Reduced
Labor Costs Lower
Connection Bolts
Insulation EPS, Glasswool, Rockwool, PU On Option
Thickness Of Panel 50mm, 75mm, 100mm, 150mm, 200mm, 250mm
Using Life 50 Years
Material Grade Q355B, Q235B
Structure type Portal frame
Design Load Wind, Snow, Seismic
Design software PKPM, Tekla structures, CAD
Sand blasting Sa 2.5
Surface treatment Anti-corrosive paint or hot dipped galvanized
Prefabricated Steel Frame Building Warehouse Workshop Portal Frame 0
Prefabricated Steel Frame Building Warehouse Workshop Portal Frame 1
Modern Prefabricated Steel Building
The Modern Prefabricated Steel Building is designed for easy assembly and recyclability, making it ideal for industrial warehouses, office spaces, and residential use. This structure utilizes steel to form a robust load-bearing framework, often referred to as the main frame, which consists of beams and columns.
The bracing system includes:
  • Tie bars
  • Knee bracing
  • Staying bars
  • Column bracing
  • Horizontal bracing
Together with the roof system, wall system, and floor system, these components create a complete metal structure that ensures exceptional stability and durability.
Prefabricated Steel Frame Building Warehouse Workshop Portal Frame 2
Prefabricated Steel Frame Building Warehouse Workshop Portal Frame 3
Prefabricated Steel Frame Building Warehouse Workshop Portal Frame 4
Compared with traditional concrete buildings, metal workshop buildings use steel plates or sectional steel instead of reinforced concrete, providing higher strength and superior seismic resistance.
Since most components are prefabricated in factories and assembled on-site, the construction period is significantly shortened. Moreover, steel is reusable and recyclable, which reduces construction waste and makes metal workshops a more eco-friendly choice.
Product Details
Products Steel Structure Warehouse
Frame type Portal frame, multi-story frame
Main frame Hot-rolled or Welded H beam and column, Q355B steel
Bracing components Tie bar, staying bar, Horizontal bracing, Column bracing
Cladding system Sandwich panel with glass wool, rock wool, PU insulation, Corrugated color steel sheet
Accessory Ridge tile, trim, Gutter, Down pipe, skylight, clerestory
Door Roll up door, industrial section door, swing door, Sliding door
Window PVC window, aluminum window, metal louver
Prefabricated Steel Frame Building Warehouse Workshop Portal Frame 5
Prefabricated Steel Frame Building Warehouse Workshop Portal Frame 6
Our Advantages
Prefabricated Steel Frame Building Warehouse Workshop Portal Frame 7
Prefabricated Steel Frame Building Warehouse Workshop Portal Frame 8
Prefabricated Steel Frame Building Warehouse Workshop Portal Frame 9
Prefabricated Steel Frame Building Warehouse Workshop Portal Frame 10
Prefabricated Steel Frame Building Warehouse Workshop Portal Frame 11
Advantages of Steel Structure Building
  • Easy to assemble: Prefabricated steel components are installed on-site as per drawings: first steel columns with cross-bracing, followed by roof beams and horizontal bracing, and finally purlins and enclosures.
  • Cost-effectiveness: Its lightweight nature reduces foundation expenses, while rapid construction allows for earlier operation. Overall economic benefits surpass those of traditional concrete buildings.
  • Simplified construction with short timelines: Factory-manufactured components are assembled on-site, drastically shortening build time. A 4,000㎡ steel structure building can be installed in approximately 40 days.
  • Energy-efficient & eco-friendly: Corrugated color steel sheets and sandwich panels boast energy-saving properties. Dry construction avoids dust and pollution from concrete work, and steel's recyclability further reduces environmental impact.
Design Key Factors
Optimal column spacing: Using H-section steel columns and beams, column spacing directly influences steel usage and costs. Typically set at 6.8-9m for economic efficiency (adjustable for specific needs). Building height should align with functional requirements (e.g., equipment, human activity) and maintenance access.
Proper lighting & ventilation: Large-span, open interiors demand human-centric, energy-saving designs. For tall buildings, ground-floor operable windows serve as primary air inlets, paired with roof ventilators to efficiently address lighting and ventilation needs.
Differences vs. Concrete Buildings
  • Shorter construction period: Prefabricated components require minimal on-site welding, making steel structure construction significantly faster than concrete builds.
  • More eco-friendly: Steel components are hoisted and spliced without water, reducing dust and pollution in surrounding areas.
  • Better cost performance: Faster construction cuts labor costs, with total expenses roughly 20-30% lower than traditional concrete buildings. Steel also offers greater durability.
  • Lighter structure: Lightweight metal walls and roofs--far lighter than brick-concrete alternatives--reduce overall weight, easing foundation loads.
Strict Quality Inspection
Prefabricated Steel Frame Building Warehouse Workshop Portal Frame 12
Prefabricated Steel Frame Building Warehouse Workshop Portal Frame 13
Frequently Asked Questions
1. What materials are used in your steel structure buildings?
Our steel structure buildings mainly use high-quality H-section steel, I-section steel, color steel plates and sandwich panels with reliable performance and durability.
2. What certifications do your steel structure buildings have?
Our products have passed ISO 9001 quality management system certification and CE certification to meet international standards and can be customized according to different market requirements.
3. How long is the construction period of a steel structure building?
The construction period depends on the size and complexity. Generally, a 4,000 square meter building can be completed in about 40 days due to prefabricated components.
4. Can steel structure buildings be customized according to needs?
Yes, we can customize the design, size, and configuration of steel structure buildings according to customers' specific usage scenarios and functional requirements.
5. Do you provide installation guidance for steel structure buildings?
We provide detailed installation drawings and instructions. For large projects, we can also send professional engineers to the site for guidance to ensure smooth installation.