-
Prefabricated Steel Structures
-
Heavy Steel Structure
-
Warehouse Steel Structure
-
Workshop Steel Structure
-
Temporary Bailey Bridge
-
Steel Airplane Hangars
-
Steel Roof Trusses
-
Steel Structure Building
-
Prefab Warehouse
-
Corrugated Metal Roofing
-
Steel Floor Decking
-
Structural Steel Bridge
-
Multi Floor Building
-
Steel Frame Structure
-
Galvanized Steel Square Tubing
-
Michael ScofieldYou always can give me the best plan ,and it lets my customer feel great,i hope we can have another chance to cooperation
-
AmokEasy to talk with, very professional and fast service, the project quality is super good.
-
TIMGood Products ,Good Service,Good Sourcing Platform!
Large Span Space Frame Peb Warehouse Construction Gable Frame Industrial
Place of Origin | Shenyang |
---|---|
Brand Name | ibeehive |
Model Number | Workshop |
Minimum Order Quantity | 500 Tons |
Packaging Details | By clients requirement in 40'OT/ 40'HQ/ 40'GP/ 20'GP Containers. |
Delivery Time | Shipped in 30 days after payment |
Payment Terms | L/C, T/T, Western Union |
Supply Ability | 50000tons per year |
Contact me for free samples and coupons.
Whatsapp:0086 18588475571
Wechat: 0086 18588475571
Skype: sales10@aixton.com
If you have any concern, we provide 24-hour online help.
xStandard | ASTM,BS,DIN,GB,JIS | Grade | Q235, Q345 |
---|---|---|---|
Dimensions | 00 SQM To 100000 SQM | Size | As Customer's Require |
Type | Light/heavy | Transport | Sea Freight |
Application | Warehouse、Workshop | Main Steel | Q345, Q235, Q345B, Q235B Etc. |
High Light | space frame peb warehouse construction,large span peb warehouse construction,gable frame warehouse steel structure |
Large Span Space Frame Steel Structure Gable Frame Industrial Steel Warehouse
Product Description
main steel frame | H section steel beam and columns, painted or galvanized, galvanized C section or steel pipe |
Secondary frame | hot-dip galvanized C purlin, steel bracing, tie bar, knee brace, edge cover, etc. |
Roof panel | EPS sandwich panel, glass fiber sandwich panel, rock wool sandwich panel, and PU sandwich panel or steel sheet |
Wall panel | Sandwich Panel or Corrugated Steel Sheet |
Tie Rod | Circular Steel Tube |
Brace | Round Bar |
Knee Brace | Angle Steel |
Roof Gutter | Color Steel Sheet |
Drawing | We can make the design and quotation according to your requirements or your drawing |
Certification | ISO9001:2000,CE. |
Steel structure application: prefabricated steel structure building
Industrial steel structure : warehouse/Steel workshop/hangar/garage/chicken shed/ shed,exhibition hall, car parking agricultural storage, logistic centers
Commercial multi-storey building : steel structure hotel /office/apartment/school/library/shopping mall buildings, garage, building,
Products & Service :
We supply completely steel structure building with Design& Engineering service: steel building, space frames, tubular steel structures, basic building elements(built-up welded H-section, hot-rolled H-section, channel, steel column, steel beam), standard frames, secondary framing, roof &wall materials, tempcon (sandwich) panels window and doors.
Payment Terms:
1) Payment: T/T(30% prepaid as deposit, balance 70% before shipment) or L/C at sight
2) Delivery time: 15~40 days, as pre customers' order
3) Shipment Loading: 20"GP, 40"GP, 40"HQ, 40"OT or in bulk
* Design
By using modern designing softwares AutoCAD, PKPM, MTS, 3D3S, Tarch, Tekla Structures (Xsteel) and etc. We provide full
designing and detailing service for :
Industrial shed: Warehouse,Workshop,Poultry farm shed,Car Parking
Commercial buildings : Office building,Hotel building,Residence buildings,School buildings
Our Company
iBeehive is a professional manufacturer of steel structure, bridge with 21 years experience, finished 3520 projects total 17600000 sqm. We specialize in providing complete solutions including consulting, design, fabrication and erection of high-quality pre-engineered steel building and steel structure products.
We have 2 factories with a total area of 21000 m², iBeehive has served the pre-engineered building industry with the highly trained crews, specialized equipment, CWI inspector, and 20 professional design team.
Success Case
Industrial Warehouse (13000M2) Argentina
Warehouse (14000M2)----Republic of Uzbekistan
Workshop (12000M2)----Canada
Warehouse (3600M2)---Romania
Vegetable Market (2500M2)----Mauritius
Pig shed (3500M2)---USA
Chicken shed (2800M2) )------ Australia
Aircraft Hangar (1300M2)------Australia
Warehouse (900M2)----Mongolia
Prefabricated house (70M2)----800sets---Angola
Container house (20')-----60 sets South Africa
Products & Service
We supply completely steel structure building with Design& Engineering service: steel building, space frames, tubular steel
structures, basic building elements(built-up welded H-section, hot-rolled H-section, channel, steel column, steel beam), standard frames, secondary framing, roof &wall materials, tempcon (sandwich) panels window and doors.
Payment Terms:
1) Payment: T/T(30% prepaid as deposit, balance 70% before shipment) or L/C at sight
2) Delivery time: 15~40 days, as pre customers' order
3) Shipment Loading: 20"GP, 40"GP, 40"HQ, 40"OT or in bulk
Steel Structure fixed packing, loading, transportation, unloading the matters needing attention:
(1) The lifting large there must be a person responsible for the use of fixture, suitable, strictly abide by the
rules of lifting, to prevent the occurrence of vibration, impact, deformation or damage, fall in the hoisting process.
(2) At the time of loading, there must be a special supervision, check car number and packing, the car pile
up securely, and to increase the necessary binding component loosening, prevent the loss.
(3) Remained stable in the transport process, the vehicle at the time of shipment, on the long, wide, high object transport, must be trained pilots, escort personnel responsible for, and mark is arranged on a vehicle.
(4) No rough handling, loading and unloading personnel handling, weight, size should be familiar with the components, and check the horse sling, rigging, prevent accidents.
(5) The member to the construction site, timely organization of unloading, stacking area.
(6) The crawler crane carrying member, should pay attention to the surrounding terrain, air condition, prevent the crawler crane overturning and component collision.