-
Prefabricated Steel Structures
-
Heavy Steel Structure
-
Warehouse Steel Structure
-
Workshop Steel Structure
-
Temporary Bailey Bridge
-
Steel Airplane Hangars
-
Steel Roof Trusses
-
Steel Structure Building
-
Prefab Warehouse
-
Corrugated Metal Roofing
-
Steel Floor Decking
-
Structural Steel Bridge
-
Multi Floor Building
-
Steel Frame Structure
-
Galvanized Steel Square Tubing
-
Michael ScofieldYou always can give me the best plan ,and it lets my customer feel great,i hope we can have another chance to cooperation
-
AmokEasy to talk with, very professional and fast service, the project quality is super good.
-
TIMGood Products ,Good Service,Good Sourcing Platform!
Pre Engineering Structure Steel Frame Construction Steel Door Frame Builders Warehouse
Place of Origin | Shenyang |
---|---|
Brand Name | ibeehive |
Minimum Order Quantity | 1000sqm |
Price | usd $55-70 square meter |
Packaging Details | Well packed, palleted and loaded into 20ft 40ft ship container for prefabricated steel warehouse flat pack packing. |
Delivery Time | 10-15 work days |
Payment Terms | T/T, L/C |
Supply Ability | 50000tons per year |
Contact me for free samples and coupons.
Whatsapp:0086 18588475571
Wechat: 0086 18588475571
Skype: sales10@aixton.com
If you have any concern, we provide 24-hour online help.
xType | Light,Heavy,Light Steel Struture,Structural Steel Warehouse,Large Warehouse | Standard | GB,ASTM,AISI,BS,DIN |
---|---|---|---|
Product Name | Industrial Factory Building Multi-storey Steel Structure Warehouse | Purlin | C.Z Shape Steel Channel,C-section And Z-section |
Material | Q235/Q345 Steel,sandwich Panel,galvanized Steel Sheet,light Steel Frame,Material | Window | Aluminum Alloy Window,PVC Or Aluminum Alloy,Sandwich Panel |
Size | As Customers' Requirments | Installation | Assigning Our Engineer On Site,Installation Drawing Or Engineer Guide |
Column And Beam | Hot Rolled Or Welded H Section,Welded H-section,I Section Etc. | Surface Treatment | Galvanised PAINTING,Hot-Dip Galvanization Or Paint |
High Light | steel structure garage,fabrication steel structure |
Warehouse steel beam standard size for prefabricated factory, plant
Advantages
1. The higher utilization rate of the area, Steel-structured houses can better meet the requirements of flexible separation between large openings in buildings than traditional buildings and can improve the area utilization rate by reducing the cross-sectional area of the columns and using lightweight wall panels. The effective indoor use area is improved by about 6%.
2. The energy-saving effect is good, the wall adopts light-weight and energy-saving standardized C-shaped steel, square steel, and sandwich panel, which has good heat preservation performance and good earthquake resistance. 50% energy will be saved
3. Has excellent seismic and wind resistance performance, The steel structure system can be used in residential buildings to make full use of the steel structure with good ductility and strong plastic deformation ability and has excellent seismic and wind resistance performance, which greatly improves the safety and reliability of the house. Especially in the case of earthquakes and typhoon disasters, the steel structure can avoid the collapse of the building.
4. The total weight of the building is light, The steel structure residential system is light in weight, about half of the concrete structure, which can greatly reduce the basic cost.
5. The construction speed is fast, the construction period is at least one-third shorter than the traditional residential system, and only one 20-day 1000-square-meter can be completed.
6. Good environmental protection, The construction of steel structure houses greatly reduces the amount of sand, stone, and ash. The materials used are mainly green, 100% recycled or degraded materials. When the building is demolished, most of the materials can be reused or degraded without causing garbage.
7. Flexible and rich, Large open room design, indoor space can be divided into multiple programs to meet the different needs of users.
8. Meet the requirements of residential industrialization and sustainable development, The steel structure is suitable for mass production in factories, with a high degree of industrialization, and can integrate advanced products such as energy saving, waterproofing, heat insulation, doors and windows into one, complete application, integrate design, production, and construction, and improve the level of construction industry.
Description
Main frame steel | Steel Welded H Section or hot rolled H section |
Purlin | C or Z Section Channel for roof and wall |
Cladding system | Sandwich Panel or Corrugated Steel Sheet with Fiber Glass Wool for wall and roof |
Tie Rod | Circular Steel Tube |
Brace | Round Bar |
Column & Transverse | Angle Steel or H Section Steel or Steel Pipe |
Knee Brace | Angle Steel |
Roof Gutter | Color Steel Sheet |
Rainspout | PVC Pipe |
Door | Sliding Sandwich Panel Door or Metal Door |
Windows | PVC/Plastic Steel/Aluminum Alloy Window |
Connecting | High Strength Bolts |
Main steel material | Q345, Q235, Q345B, Q235B,Q355 etc |
Packing | Decided by you , loaded into 1X 40ft GP,1X20 ft GP,1X40 ft HQ |
Drawing | We can make the design and quotation according to your require or you |
Crane | Decided by you |
Components of warehouse
Stype
Project cases
We Can Provide
1. Customized design will be provide with free
We can design complex industrial building for clients by using AutoCAD, PKPM, MTS, 3D3S, Tarch, Tekla Structures (Xsteel) and etc.
2. Steel Structure Building Manufacturing Process:
3. We have many production lines and strong production capacity as follows:
2 fabrication factory tatol area 18000 Sqm!
5 heavy steel structure production lines!
1 assembly workshop that can assembly steel bridge!
Production capacity of steel structure components: 50000 tons per year
Total area of finished steel structure projects: 17600000 m2
We have enough strong production space and production capacity to delivery the goods on time.
4. Quality control.
General fabrication main process of steel structure is divided into: material preparation →cutting→ assembling→ welding→ drilling → assembly → correction → shot blasting and rust removal → painting → number →component acceptance ex-factory. In the steel structure production, according to the steel structure production process flow, grasp the key processes for quality control, such as control of key parts processing, main components of the process, measures, processing equipment, process equipment, etc. Each processing part, we can have strict inspection specifications. Welding engineering is the most important link in steel structure fabrication and installation engineering. For the welding,
We have our qualified CWI welding inspector to control the quality according to AWS-D1.1/D1.5 welding quality system. Spot welding strictly weld according to AWS welding quality system.
Get the best price
Please kindly inform us information as below if you are interested our products.
Such as these questions:
1. Usage: _____ for warehouse,workshop, showroom etc.
2. Location (where will be built? ) _____country, area
3. Size: Length*width*height _____mm*_____mm*_____mm
4. Wind load (max. Wind speed) _____kn/m2, _____km/h, _____m/s
5. Snow load (max. Snow height)_____kn/m2, _____mm
6. Anti-earthquake _____level
7. Brick wall needed or not If yes, 1.2m high or 1.5m high
8. Thermal insulation
If yes, EPS, fiberglass wool, rock wool, PU sandwich panels will be suggested;
If not, the metal steel sheets will be OK.
The cost of the latter will be much lower than that of the former.
9. Door quantity & size _____units, _____(width)mm*_____(height)mm
10. Window quantity & size _____units, _____(width)mm*_____(height)mm
11. Crane needed or not If yes, _____units, max. Lifting weight____tons;
Max. Lifting height _____m.
FAQ
Q1: Can I have a visit to your factory before the order?
A: Why not? Welcome to visit our factory. You can fly to Shenyang Taoxian Airport, then we will pick you up at the airport, hotel booking service is available.
Q2: Do you supply installation service?
A: Yes, we do. But you will pay for our professional installation cost at your local place, then we will send the engineers to supervise it.
Q3: How long can the frame be used?
A: The use life of the main structure is the designed used life, usually is 50-100 years (standard request of GB)
Q4: How long is the use life of the roof cover?
A: The use life of the PE coating is usually 10-25 years. The use life of roof sun light sheet is shorter, usually 8-15 years
Q5: What is the anti-rust treatment for steel structure?
A:Anti-rust treatment of steel structure
Normal anti-rust paint
Anti-rust paint with epoxy zinc primer
Hot-dip galvanization
Hop-dip galvanization + PU finish
Powder coating
Stainless steel structure: No. 301/304/316 stainless steel structure
Q6: How do we cooperate on certain project?
A: Firstly, please send us your project details and your requirements. Then we will design accordingly, free of charge. Afterwards, please check and confirm whether you like the drawings. If not, we shall get the drawings revised until your confirmation. Finally we make a deal.