-
Prefabricated Steel Structures
-
Heavy Steel Structure
-
Warehouse Steel Structure
-
Workshop Steel Structure
-
Temporary Bailey Bridge
-
Steel Airplane Hangars
-
Steel Roof Trusses
-
Steel Structure Building
-
Prefab Warehouse
-
Corrugated Metal Roofing
-
Steel Floor Decking
-
Structural Steel Bridge
-
Multi Floor Building
-
Steel Frame Structure
-
Galvanized Steel Square Tubing
-
Michael ScofieldYou always can give me the best plan ,and it lets my customer feel great,i hope we can have another chance to cooperation
-
AmokEasy to talk with, very professional and fast service, the project quality is super good.
-
TIMGood Products ,Good Service,Good Sourcing Platform!
Customized Light Truss Steel Structure Steel Frame Roof Trusses For Sport Hall
Contact me for free samples and coupons.
Whatsapp:0086 18588475571
Wechat: 0086 18588475571
Skype: sales10@aixton.com
If you have any concern, we provide 24-hour online help.
xStandard | AISI, ASTM, BS, DIN, GB, JIS | Type | Steel Structure Building |
---|---|---|---|
Steel Frame Durable Years | 50 Years | Drawing Design | CAD Or 3D Drawing |
Max Span | 72 Meters | Certificate | ISO9001:2000 |
Color | As Per As Customers | ||
High Light | prefabricated steel trusses,structural steel trusses |
Customized Light Truss Steel Structure Steel Frame Roof Trusses For Sport Hall
Product Description:
Characters:
1. Wide span: single span or multiple spans, the max span clear distance is 36m, without middle columns.
2. Low cost
3. Fast construction and easy in installation
4. Long term service life: more than 50 years.
5. Environmental protection, stable structure, earthquake resistance, water proofing, and energy saving
6 Light weight ,convenient for loading and transportation
Main components:
Main Steel Frame | H section steel;Welding;Rust removing;Surface processing;Intensive bolt |
Supporting System | Angle Brace; Cross Support; Belt Bar; Small Brace; Ordinary Bolt |
Roof | Purlin; Out-roof Panel; Transparent lighting panel; Accessories; Edge Cover; Gutter; Rainspout |
Wall | Purlin; Wall; Accessories; Edge Cover; Axial fan; Door & window |
Main materials:
1 Q235 Q345 H section steel structure for columns and beam
2 pre-embeding anchor bolts for connection columns to founction
3 intensive bolts for connection tween columns and beams
4 wall/roof panel:one layer corrugated steelplate or sandwich panels
5 windows/doors:PVC,aluminum alloy,steel
6 color steel plate or galvanized steel gutters and PVC tubes for rain water
If you need us to quote for you, please kindly let us know the following:
Project Name | steel structure building |
Size | total length and width, roof and eave height, roof pitch, etc |
Roof and Wall | option: EPS, fiber glass, rock wool or PU sandwich panel |
Door and Window | PVC or Aluminum alloy; sliding door or rolled door |
Column and Beam | option:hot rooled or welded H section, I section; painting or galvanized |
Purlin | option:C-Section or Z-section |
Local Climate | 1. wind speed 2. snow load 3. rain quantity 4. earthquake grade if have More details is preferred. |
Crane Parameter | If need crane beam, crane tons parameter and lift height are needed |
Drawing | 1. according to clients' drawing |
2. design as per clients' dimension and requests | |
Package | Naked loaded in shipping container or as per requests. |
Loading | 20 GP, 40HP, 40 GP, 40 OT |
1 Common type of the industrial building?
Portal frame is the usual type in the industrial workshop and warehouse shed,other types also could be designed and manufacturer as per customers request.
2 What is the quality grade of the steel structure components?
Q345 is used for main steel structure,Q235 is used for secondary steel structure.
3 How about the delivery time?
Usually,within 30-45 days after the order confirmed,also depends on the fabrication
quantity.
4 How about the derust grade?
Ball blasting Sa 2.5 on main steel structure
manual derust St 2.0 on secondary steel structure.
5 What kind panel used for the roof and wall?
Color corrugated steel sheet and sandwich panel could be used,sandwich panel perfoms well on the heat insulation,sound insulation,common sandwich materials are EP glass wool and PU.
6 How to install it?
We will furnish you the detailed construction drawing and the construction manual
which could help you to erect and install the building step by step,we also could send the engineer to your local to help you if needed.
7 Maintenance?
Finish paint need be done after the frame installed and do it again after 6-8 months so the surface will stay more time.