Products
Contact Us
Contact Now
Simple Install Prefabricated Construction Building Steel Frame Structure Workshop
| MOQ: | 1000 sqm |
| Price: | USD 40-60 / sqm |
| Standard Packaging: | Packed on steel pallet with fixture and loaded into 40'HQ/OT |
| Delivery Period: | 6 weeks after shop drawing get approval |
| Payment Method: | T/T,L/C |
| Supply Capacity: | 100,000 sqm / month |
Detail Information
Place of Origin
Shandong, China
Brand Name
TISIN
Certification
ISO, CE, SGS
Type:
Portal Frame Structure
Design Software:
PKPM, Tekla Structures, CAD
Material:
Q235B/Q355B Steel
Main Frame:
Welded H-shape Steel Beam
Welding Method:
SAW, MIG,GMAW
Surface Treatment:
Anti-corrosive Paint Or Hot Dipped Galvanized
Life Time:
Main Structure 35-50 Years
Delivery Time:
25-40 Days
Standard:
GB Standard
Material Grade:
Q355B, Q235B
Structure Type:
Portal Frame
Design Load:
Wind, Snow, Seismic
Highlight:
prefabricated steel warehouse building
,metal space frame construction
,steel structure warehouse with warranty
Product Description
Simple Install Prefabricated Construction Building Steel Frame Structure Workshop
Product Specifications
| Attribute | Value |
|---|---|
| Type | Portal Frame Structure |
| Design software | PKPM, Tekla structures, CAD |
| Material | Q235B/Q355B Steel |
| Main frame | Welded H-shape Steel Beam |
| Welding method | SAW, MIG, GMAW |
| Surface treatment | Anti-corrosive paint or hot dipped galvanized |
| Life Time | Main Structure 35-50 Years |
| Delivery Time | 25-40 Days |
| Standard | GB Standard |
| Material Grade | Q355B, Q235B |
| Structure type | Portal frame |
| Design Load | Wind, Snow, Seismic |
Product Description
Key Features
Additional Specifications
| Products | Steel structure Fabrication |
|---|---|
| Material | Q235B, Q345B, S235JR, S355JR, SS400, A36, A572Gr50, A992 |
| Surface treatment | 1. Painting; 2. Galvanized |
| Certification | ISO9001, ISO14001, OHSAS18001, EN1090, ISO3834 |
| Standard | GB, ASTM, EN, ISO, AS/ANS |
| Specification | Per drawing |
| Place of Origin | Shandong, China |
| MOQ | 20 Tons |
| Application | Steel Warehouse, Steel Workshop, Multi-storey Building |
Welding Procedures
We undertake all welding procedures in accordance with GB standard. Our dedicated Welding Inspectors are certified by the government authority.
We perform non-destructive testing (NDT) in accordance with contract documents and applicable welding codes. As part of this process, we ensure that all inspections, test plans and quality manuals are fully documented and maintained.
Tests we conduct include:
- Dimension check
- Visual examination
- Ultrasonic testing
Frequently Asked Questions
Q1: Can I visit your factory before ordering?
A: Yes, we welcome factory visits. We can arrange airport pickup from Qingdao Airport and assist with hotel bookings.
Q2: How do we cooperate on a project?
A: Our process includes: 1) Reviewing your project requirements, 2) Providing free design drawings for your approval, 3) 30% deposit after contract signing, 4) Final design confirmation, 5) Production and final payment before shipment, 6) Optional installation support.
Q3: What is the price range?
A: Prices vary based on material quality, size, and design complexity, typically ranging from $19 to $100+ per square meter.
Q4: Do you provide installation service?
A: We provide detailed construction drawings and manuals. For additional support, we can send workers and engineers to your site (with costs covered by the buyer).
Q5: What is the delivery time?
A: Typically 30 days after deposit receipt, with partial shipments available for large orders.
Q6: What anti-rust treatments are available?
A: Options include: normal anti-rust paint, epoxy zinc primer, hot-dip galvanization, hot-dip galvanization with PU finish, or stainless steel structures (301/304/316).
Q7: How is quality controlled?
A: Our products meet CE EN1090 and ISO9001:2008 standards. We provide quality inspection reports to verify materials and manufacturing processes.
Overall Rating
5 star
100%
4 star
0
3 star
0
2 star
0
1 star
0
All Reviews
-
JVery save time and money,install very fast,and Thanks the engineer's guidance.