products
PRODUCTS DETAILS
Home > Products >
Prefabricated Steel Prefab Buildings Warehouse Workshop Multi Building C Z Purlin

Prefabricated Steel Prefab Buildings Warehouse Workshop Multi Building C Z Purlin

MOQ: 800 sqm
Price: USD 40-60 / sqm
Standard Packaging: Packed on steel pallet with fixture and loaded into 40'HQ/OT
Delivery Period: 6 weeks after shop drawing get approval
Payment Method: T/T,L/C
Supply Capacity: 100,000 sqm / month
Detail Information
Place of Origin
Shandong, China
Brand Name
TSIN
Certification
ISO, CE, SGS
Model Number
TSIN-PH-Structure 04
Application Fields:
Warehouse, Multi-building, Workshops&plants ,hospital ,School, Office ,Apartment
Raw Steel Material::
Q235B, Q355B, ASTM A36
Frame Type::
Portal Frame
Design Parameter::
Wind Load,Snow Load And Earthquake
Working Scope::
Design,Fabrication, Installation
Life Span::
Around 40~50 Year
Highlight:

Prefabricated steel prefab buildings

,

Z Purlin steel prefab buildings

,

C Purlin steel structure prefab house

Product Description
Prefabricated Steel Structure for Warehouse Workshop Multi-Building
Self-designed sturdy multi-purpose steel structure suitable for warehouses, workshops, multi-storey buildings, shopping malls, exhibitions, offices, and more.
Key Specifications
Application Fields Warehouse, Multi-building, Workshops & plants, Hospital, School, Office, Apartment
Raw Steel Material Q235B, Q355B (ASTM A36)
Frame Type Portal Frame / Steel Frame
Design Parameters Wind Load, Snow Load, Earthquake Grade
Structure Life Span 45-50 Years
After-sale Service Online technical support, Onsite Installation
Steel Structure Description
Prefabricated steel structure building system comprises structure frame system, panel cover system, fitting system, and other accessories. The steel frame system forms the building's skeleton, while the panel system provides enclosure. All components are bolted together for convenient and efficient installation.
Construction Features
  • Lightweight construction with high strength, large spans, and reduced foundation pressure
  • Shorter construction period compared to concrete buildings with simple on-site assembly
  • 20-30% lower investment cost than traditional buildings
  • High fireproof performance and corrosion resistance
  • Buildings can be disassembled, moved easily, and recycled with no pollution
Technical Specifications
Dimension Length × width × eave height, roof slope
Type Single/double/multi-slope; Single/double/multi-span; Single/double/multi-floor
Foundation Concrete and steel foundation bolts
Column and Beam Hot rolled or welded H steel Q355B, high strength bolts connection
Bracing X or V type bracing made from angle steel or pipe
C/Z Purlin Q235B C/Z section steel (C160-300 or Z160-300)
Prefabricated Steel Prefab Buildings Warehouse Workshop Multi Building C Z Purlin 0 Prefabricated Steel Prefab Buildings Warehouse Workshop Multi Building C Z Purlin 1 Prefabricated Steel Prefab Buildings Warehouse Workshop Multi Building C Z Purlin 2 Prefabricated Steel Prefab Buildings Warehouse Workshop Multi Building C Z Purlin 3
Quality Control
We implement rigorous quality control measures throughout the project lifecycle:
  • Material inspections before and after fabrication
  • Precision measuring, cutting, and welding
  • Accurate hole and cleat placement
  • Proper packaging and loading sequence
  • On-site erection when required
Prefabricated Steel Prefab Buildings Warehouse Workshop Multi Building C Z Purlin 4
Frequently Asked Questions
Q: Can I visit your factory before ordering?
A: Yes, we welcome factory visits. We can arrange airport pickup from Qingdao Airport and assist with hotel bookings.
Q: What is the delivery time?
A: Typically 30 days after deposit receipt, with partial shipment available for large orders.
Q: What anti-rust treatments are available?
A: Options include: normal anti-rust paint, epoxy zinc primer, hot-dip galvanization, hot-dip galvanization with PU finish, or stainless steel (301/304/316).