products
PRODUCTS DETAILS
Home > Products >
Modern Prefabricated Steel Frame Building For Industrial Warehouse Use

Modern Prefabricated Steel Frame Building For Industrial Warehouse Use

MOQ: 1000 sqm
Price: USD 40-60 / sqm
Standard Packaging: Packed on steel pallet with fixture and loaded into 40'HQ/OT
Delivery Period: 6 weeks after shop drawing get approval
Payment Method: T/T,L/C
Supply Capacity: 100,000 sqm / month
Detail Information
Place of Origin
Shandong, China
Brand Name
TSIN
Certification
ISO, CE, SGS
Model Number
TSIN
Warranty:
5 Years
Maintenance Costs:
Reduced
Labor Costs:
Lower
Connection:
Bolts
Insulation:
EPS, Glasswool, Rockwool, PU On Option
Thickness Of Panel:
50mm, 75mm, 100mm, 150mm, 200mm, 250mm
Using Life:
50 Years
Product:
Steel Structure
Material Grade:
Q355B, Q235B
Structure Type:
Portal Frame
Design Load:
Wind, Snow, Seismic
Design Software:
PKPM, Tekla Structures, CAD
Sand Blasting:
Sa 2.5
Surface Treatment:
Anti-corrosive Paint Or Hot Dipped Galvanized
Highlight:

prefabricated steel frame building

,

steel frame building with warranty

,

Industrial steel building

Product Description
Modern Prefabricated Steel Frame Building for Industrial Warehouse Use
Product Specifications
Attribute Value
Warranty 5 Years
Maintenance Costs Reduced
Labor Costs Lower
Connection Bolts
Insulation EPS, Glasswool, Rockwool, PU On Option
Thickness Of Panel 50mm, 75mm, 100mm, 150mm, 200mm, 250mm
Using Life 50 Years
Material Grade Q355B, Q235B
Structure type Portal frame
Design Load Wind, Snow, Seismic
Design software PKPM, Tekla structures, CAD
Surface treatment Anti-corrosive paint or hot dipped galvanized
Modern Prefabricated Steel Frame Building For Industrial Warehouse Use 0
Modern Prefabricated Steel Building
The Modern Prefabricated Steel Building is designed for easy assembly and recyclability, making it suitable for industrial warehouses, office spaces, and residential use. This building utilizes steel to create a load-bearing structure known as the main frame, which consists of beams and columns.
The bracing system includes:
  • Tie bars
  • Knee bracing
  • Stay bars
  • Column bracing
  • Horizontal bracing
Together with the roof system, wall system, and floor system, these components form a complete metal structure that ensures stability and durability.
Modern Prefabricated Steel Frame Building For Industrial Warehouse Use 1 Modern Prefabricated Steel Frame Building For Industrial Warehouse Use 2
Advantages of Metal Workshop Buildings
Compared to traditional concrete buildings, metal workshop structures offer several key advantages:
  • Superior Strength and Seismic Resistance: Metal workshops utilize steel plates or sectional steel, providing much higher strength and improved seismic resistance.
  • Reduced Construction Time: With components prefabricated in factories, on-site assembly is quick, significantly shortening the construction period.
  • Environmental Benefits: Steel is reusable and recyclable, which reduces construction waste and minimizes environmental impact.
  • Cost Efficiency: Lower material costs and reduced labor time lead to overall cost savings for projects.
In summary, metal workshop buildings provide a strong, efficient, and environmentally friendly solution for industrial needs.
Product Details
Products Steel Structure Warehouse
Frame type Portal frame, multi-story frame
Main frame Hot-rolled or Welded H beam and column, Q355B steel
Bracing components Tie bar, staying bar, Horizontal bracing, Column bracing
Cladding system Sandwich panel with glass wool, rock wool, PU insulation, Corrugated color steel sheet
Accessory Ridge tile, trim, Gutter, Down pipe, skylight, clerestory
Door Roll up door, industrial section door, swing door, Sliding door
Window PVC window, aluminum window, metal louver
Modern Prefabricated Steel Frame Building For Industrial Warehouse Use 3 Modern Prefabricated Steel Frame Building For Industrial Warehouse Use 4
Our Advantages
  • Easy to assemble: Prefabricated steel components are installed on-site as per drawings: first steel columns with cross-bracing, followed by roof beams and horizontal bracing, and finally purlins and enclosures.
  • Cost-effectiveness: Its lightweight nature reduces foundation expenses, while rapid construction allows for earlier operation. Overall economic benefits surpass those of traditional concrete buildings.
  • Simplified construction with short timelines: Factory-manufactured components are assembled on-site, drastically shortening build time. A 4,000㎡ steel structure building can be installed in approximately 40 days.
  • Energy-efficient & eco-friendly: Corrugated color steel sheets and sandwich panels boast energy-saving properties. Dry construction avoids dust and pollution from concrete work, and steel's recyclability further reduces environmental impact.
Design Key Factors
Optimal Column Spacing:
Using H-section steel columns and beams, column spacing directly affects steel usage and costs. Typically set between 6.8 to 9 meters for economic efficiency, this can be adjusted based on specific needs. Additionally, building height should align with functional requirements, such as equipment space, human activity, and maintenance access.
Proper Lighting & Ventilation:
Large-span, open interiors require human-centric, energy-efficient designs. For taller buildings, operable windows on the ground floor serve as primary air inlets, complemented by roof ventilators to effectively address lighting and ventilation needs.
Differences Compared to Concrete Buildings
  • Shorter Construction Period: Prefabricated components require minimal on-site welding, allowing for significantly faster construction compared to traditional concrete builds.
  • More Eco-Friendly: Steel components are hoisted and joined without the use of water, reducing dust and pollution in the surrounding environment.
  • Better Cost Performance: The speed of construction reduces labor costs, with total expenses typically 20-30% lower than those of traditional concrete buildings. Additionally, steel offers enhanced durability.
  • Lighter Structure: Lightweight metal walls and roofs are considerably lighter than brick or concrete alternatives, reducing overall structural weight and easing foundation loads.
Modern Prefabricated Steel Frame Building For Industrial Warehouse Use 5 Modern Prefabricated Steel Frame Building For Industrial Warehouse Use 6
Frequently Asked Questions
What materials are used in your steel structure buildings?
Our steel structure buildings mainly use high-quality H-section steel, I-section steel, color steel plates and sandwich panels with reliable performance and durability.
What certifications do your steel structure buildings have?
Our products have passed ISO 9001 quality management system certification and CE certification to meet international standards and can be customized according to different market requirements.
How long is the construction period of a steel structure building?
The construction period depends on the size and complexity. Generally, a 4,000 square meter building can be completed in about 40 days due to prefabricated components.
Can steel structure buildings be customized according to needs?
Yes, we can customize the design, size, and configuration of steel structure buildings according to customers' specific usage scenarios and functional requirements.
Do you provide installation guidance for steel structure buildings?
We provide detailed installation drawings and instructions. For large projects, we can also send professional engineers to the site for guidance to ensure smooth installation.