Products
PRODUCTS DETAILS
Home > Products >
Prefab Steel Structure Construction Vegetable Workshop Steel Structure Office Villa Building

Prefab Steel Structure Construction Vegetable Workshop Steel Structure Office Villa Building

MOQ: 1000 sqm
Price: USD 40-60 / sqm
Standard Packaging: Packed on steel pallet with fixture and loaded into 40'HQ/OT
Delivery Period: 6 weeks after shop drawing get approval
Payment Method: T/T,L/C
Supply Capacity: 100,000 sqm / month
Detail Information
Place of Origin
Shandong, China
Brand Name
TSIN
Certification
ISO, CE, SGS
Model Number
TSIN
Warranty:
5 Years
Maintenance Costs:
Reduced
Labor Costs:
Lower
Connection:
Bolts
Insulation:
EPS, Glasswool, Rockwool, PU On Option
Thickness Of Panel:
50mm, 75mm, 100mm, 150mm, 200mm, 250mm
Using Life:
50 Years
Product:
Steel Structure
Material Grade:
Q355B, Q235B
Structure Type:
Portal Frame
Design Load:
Wind, Snow, Seismic
Design Software:
PKPM, Tekla Structures, CAD
Sand Blasting:
Sa 2.5
Surface Treatment:
Anti-corrosive Paint Or Hot Dipped Galvanized
Connection Type:
Bolts
Insulation Material:
EPS, Glasswool, Rockwool, PU
Panel Thickness:
50mm, 75mm, 100mm, 150mm, 200mm, 250mm
Highlight:

Prefab Steel Structure Construction

,

Steel Structure Construction Office

,

50mm steel column construction

Product Description
Low Cost Prefab Steel Structure Construction Vegetable Workshop Steel Structure Office Villa Building

Product Description

Modern Prefabricated Steel Building
The Modern Prefabricated Steel Building is designed for easy assembly and recyclability, making it an excellent choice for industrial warehouses, offices, and residential spaces. Constructed from high-quality steel, it features a robust load-bearing framework composed of beams and columns.

Structural Components
This building includes a comprehensive bracing system that ensures stability and longevity, featuring:

  • Tie bars
  • Knee bracing
  • Stay bars
  • Column bracing
  • Horizontal bracing

These components work in harmony with precision-engineered roof, wall, and floor systems to create a reliable and durable metal structure.

Advantages Over Traditional Concrete Buildings

  • Superior Strength: Utilizes steel plates or sectional steel to enhance structural integrity and improve resistance to seismic activity.

  • Faster Construction: Prefabricated components allow for quick on-site assembly, significantly reducing the overall construction timeline.

  • Sustainability: Steel is both reusable and recyclable, minimizing construction waste and promoting environmental stewardship.

This modern steel building offers a versatile, efficient, and eco-friendly solution, expertly balancing strength, speed, and sustainability for a variety of applications.

Prefabricated steel structureSteel structure warehouseSteel building construction

PRODUCT SPECIFICATIONS

Products Steel Structure Warehouse
Frame type Portal frame, multi-story frame
Main frame Hot-rolled or Welded H beam and column, Q355B steel
Bracing components Tie bar, staying bar, Horizontal bracing, Column bracing
Cladding system Sandwich panel with glass wool, rock wool,PU insulation,Corrug ated color steel sheet
Accessory Ridge tile, trim, Gutter, Down pipe,skylight, clerestory
Door Roll up door, industrial section door, swing door, Sliding door
Window PVC window, aluminum window, metal louver
Steel structure warehouse

Our Advantages

Benefits of Steel Structure Buildings

  • Easy Assembly
    Prefabricated steel components are installed on-site according to detailed drawings. The assembly process involves erecting steel columns with cross-bracing, installing roof beams with horizontal bracing, and fitting purlins and enclosure panels, ensuring a smooth and efficient construction flow.

  • Cost Efficiency
    The lightweight nature of steel significantly reduces foundation costs. Combined with a faster construction schedule, projects can be completed sooner, leading to earlier operational readiness and improved overall economic returns compared to traditional concrete buildings.

  • Streamlined Construction with Short Timelines
    Factory-manufactured parts arrive ready for quick assembly on-site, dramatically shortening the build time. Typically, a steel structure can be completed within just a few weeks.

  • Energy Efficiency & Environmental Friendliness
    Corrugated color steel sheets and insulated sandwich panels provide excellent thermal performance, contributing to energy savings. Additionally, dry construction methods minimize dust and pollution, while the recyclable nature of steel supports sustainable building practices.

Differences Compared to Concrete Buildings

  • Faster Construction Period
    Prefabricated steel components require minimal on-site welding, allowing for significantly quicker assembly compared to traditional concrete structures.
  • Improved Environmental Impact
    The assembly of steel components uses no water and produces less dust and pollution, resulting in a cleaner construction environment.
  • Better Cost Performance
    The expedited construction process leads to reduced labor costs, typically resulting in total expenses that are 20-30% lower than those of conventional concrete buildings. Additionally, steel offers superior durability and longevity.
  • Lighter Structural Load
    Utilizing lightweight metal walls and roofs significantly decreases the overall weight of the building, which in turn reduces the foundation load compared to brick or concrete alternatives.
Quality certification

FAQ
1. What materials are used in your steel structure buildings?
Our buildings are primarily made from premium H-section steel, I-section steel, color-coated steel plates, and insulated sandwich panels — all selected for their superior strength, durability, and long service life.
2. What certifications do your steel structure buildings have?
Our products are certified under the ISO 9001 quality management system and CE certification, ensuring they meet strict international quality and safety standards. We can also provide customized certifications to meet specific market or project requirements.
3. How long does it take to construct a steel structure building?
Construction time depends on the size and complexity of the project. For example, a 4,000 m² building can typically be completed in about 40 days, thanks to the efficiency of prefabricated components and streamlined on-site assembly.
4. Can the buildings be customized to meet specific requirements?
Absolutely. We offer full customization of design, dimensions, layouts, and configurations to suit your intended use, whether for industrial, commercial, agricultural, or residential purposes.
5. Do you provide installation guidance?
Yes. Every project includes detailed installation drawings and step-by-step instructions. For large-scale or complex projects, we can also send experienced engineers to the site to provide professional installation guidance and technical support.