Products
PRODUCTS DETAILS
Home > Products >
Portal Frame Prefab Metal Structures Industrial Commercial Fabrication Hall

Portal Frame Prefab Metal Structures Industrial Commercial Fabrication Hall

MOQ: 1000 sqm
Price: USD 40-60 / sqm
Standard Packaging: Packed on steel pallet with fixture and loaded into 40'HQ/OT
Delivery Period: 6 weeks after shop drawing get approval
Payment Method: T/T,L/C
Supply Capacity: 100,000 sqm / month
Detail Information
Place of Origin
Shandong, China
Brand Name
TSIN
Certification
ISO, CE, SGS
Model Number
TSIN
Application Fields:
Warehouse, Multi-building, Workshops & Plants, Hospital, School, Office, Apartment
Drawing Design:
AUTOCAD, SOLIDWORKS, TEKLA
Maximum Roof Load (lb./sq.ft)::
20+lb/sq.ft
Raw Steel Material:
Q235B, Q355B, ASTM A36
Frame Type:
Portal Frame
Design Parameter:
Wind Load,Snow Load And Earthquake
Working Scope:
Design, Fabrication, Installation
Life Span:
Around 30~50 Year
Surface Treatment:
1. Painting; 2. Galvanized;
Standard:
GB, ASTM, EN, ISO, AS/ANS
Highlight:

Portal Frame prefab metal structures

,

Industrial prefab metal structures

,

Commercial prefab metal warehouse

Product Description
Versatile Modern Design Steel Structure Workshop
Product Attributes
Application Fields Warehouse, Multi-building, Workshops & plants, Hospital, School, Office, Apartment
Drawing Design AUTOCAD, SOLIDWORKS, TEKLA
Maximum Roof Load 20+lb/sq.ft
Raw Steel Material Q235B, Q355B, ASTM A36
Frame Type Portal Frame
Design Parameter Wind Load, Snow Load And Earthquake
Working Scope Design, Fabrication, Installation
Life Span Around 30~50 Year
Surface treatment 1. Painting; 2. Galvanized
Standard GB, ASTM, EN, ISO, AS/ANS
Modern Prefabricated Steel Building

The Modern Prefabricated Steel Building is designed for easy assembly and recyclability, making it an ideal choice for industrial warehouses, offices, and residential applications. Constructed from high-quality steel, this building features a robust load-bearing framework, known as the main frame, which includes beams and columns.

Structural Components

This building incorporates a comprehensive bracing system, consisting of:

  • Tie bars
  • Knee bracing
  • Stay bars
  • Column bracing
  • Horizontal bracing

These elements work together with precision-engineered roof, wall, and floor systems, ensuring a durable and stable metal structure.

Advantages Over Traditional Concrete Buildings
  • Enhanced Strength: Utilizing steel plates or sectional steel provides superior structural integrity and improved seismic resistance.
  • Faster Construction: Prefabricated components allow for quick on-site assembly, significantly shortening the overall construction timeline.
  • Sustainability: The reusable and recyclable nature of steel minimizes construction waste and promotes environmental responsibility.
Portal Frame Prefab Metal Structures Industrial Commercial Fabrication Hall 0 Portal Frame Prefab Metal Structures Industrial Commercial Fabrication Hall 1 Portal Frame Prefab Metal Structures Industrial Commercial Fabrication Hall 2
Product Specifications
Products Steel Structure Warehouse
Frame type Portal frame, multi-story frame
Main frame Hot-rolled or Welded H beam and column, Q355B steel
Bracing components Tie bar, staying bar, Horizontal bracing, Column bracing
Cladding system Sandwich panel with glass wool, rock wool, PU insulation, Corrugated color steel sheet
Accessory Ridge tile, trim, Gutter, Down pipe, skylight, clerestory
Door Roll up door, industrial section door, swing door, Sliding door
Window PVC window, aluminum window, metal louver
Portal Frame Prefab Metal Structures Industrial Commercial Fabrication Hall 3 Portal Frame Prefab Metal Structures Industrial Commercial Fabrication Hall 4
Advantages of Steel Structure Buildings
  • Easy to Assemble: Prefabricated steel components are installed on-site according to drawings. The assembly sequence includes steel columns with cross-bracing, roof beams and horizontal bracing, followed by purlins and enclosures.
  • Cost-Effectiveness: The lightweight nature of steel reduces foundation expenses, while rapid construction allows for earlier operation. Overall economic benefits surpass those of traditional concrete buildings.
  • Simplified Construction: Factory-manufactured components are assembled on-site, drastically shortening build time. A 4,000㎡ steel structure can be installed in approximately 40 days.
  • Energy-Efficient & Eco-Friendly: Corrugated color steel sheets and sandwich panels offer energy-saving properties. Dry construction minimizes dust and pollution, while steel's recyclability further reduces environmental impact.
Differences vs. Concrete Buildings
  • Shorter Construction Period: Minimal on-site welding in prefabricated components makes steel structure construction significantly faster than concrete builds.
  • More Eco-Friendly: Steel components are hoisted and spliced without water, reducing dust and pollution in surrounding areas.
  • Better Cost Performance: Faster construction reduces labor costs, with total expenses approximately 20-30% lower than traditional concrete buildings. Steel also offers greater durability.
  • Lighter Structure: Lightweight metal walls and roofs significantly reduce overall weight, easing foundation loads compared to brick-concrete alternatives.
Portal Frame Prefab Metal Structures Industrial Commercial Fabrication Hall 5 Portal Frame Prefab Metal Structures Industrial Commercial Fabrication Hall 6
Frequently Asked Questions
What materials are used in your steel structure buildings?

Our steel structure buildings mainly use high-quality H-section steel, I-section steel, color steel plates and sandwich panels with reliable performance and durability.

What certifications do your steel structure buildings have?

Our products have passed ISO 9001 quality management system certification and CE certification to meet international standards and can be customized according to different market requirements.

How long is the construction period of a steel structure building?

The construction period depends on the size and complexity. Generally, a 4,000 square meter building can be completed in about 40 days due to prefabricated components.

Can steel structure buildings be customized according to needs?

Yes, we can customize the design, size, and configuration of steel structure buildings according to customers' specific usage scenarios and functional requirements.

Do you provide installation guidance for steel structure buildings?

We provide detailed installation drawings and instructions. For large projects, we can also send professional engineers to the site for guidance to ensure smooth installation.