-
Prefabricated Steel Structures
-
Heavy Steel Structure
-
Warehouse Steel Structure
-
Workshop Steel Structure
-
Temporary Bailey Bridge
-
Steel Airplane Hangars
-
Steel Roof Trusses
-
Steel Structure Building
-
Prefab Warehouse
-
Corrugated Metal Roofing
-
Steel Floor Decking
-
Structural Steel Bridge
-
Multi Floor Building
-
Steel Frame Structure
-
Galvanized Steel Square Tubing
-
Michael ScofieldYou always can give me the best plan ,and it lets my customer feel great,i hope we can have another chance to cooperation
-
AmokEasy to talk with, very professional and fast service, the project quality is super good.
-
TIMGood Products ,Good Service,Good Sourcing Platform!
Industrial Metal Buildings Metal Frame Shed Prefabricated Warehouse Price
Place of Origin | Shenyang |
---|---|
Brand Name | ibeehive |
Model Number | Workshop |
Minimum Order Quantity | 500 Tons |
Packaging Details | By clients requirement in 40'OT/ 40'HQ/ 40'GP/ 20'GP Containers. |
Delivery Time | Shipped in 30 days after payment |
Payment Terms | L/C, T/T, Western Union |
Supply Ability | 50000tons per year |
![](/images/productalert.jpg)
Contact me for free samples and coupons.
Whatsapp:0086 18588475571
Wechat: 0086 18588475571
Skype: sales10@aixton.com
If you have any concern, we provide 24-hour online help.
xStandard | ASTM,BS,DIN,GB,JIS | Grade | Q235, Q345 |
---|---|---|---|
Dimensions | 00 SQM To 100000 SQM | Size | As Customer's Require |
Type | Light/heavy | Transport | Sea Freight |
Application | Warehouse、Workshop | ||
High Light | prefab steel workshop Q235,prefab steel workshop Q345,ASTM prefab metal workshop |
Main steel frame |
H section steel beam and columns, painted or galvanized, galvanized C section or steel pipe |
Secondary frame |
hot dip galvanized C purlin , steel bracing , tie bar , knee brace , edge cover etc. |
Roof panel |
EPS sandwich panel , glass fiber sandwich panel , rock wool sandwich panel , and PU sandwich panel or steel sheet |
Wall panel |
Sandwich Panel or Corrugated Steel Sheet |
Tie Rod |
Circular Steel Tube |
Brace |
Round Bar |
Knee Brace |
Angle Steel |
Roof Gutter |
Color Steel Sheet |
Drawing |
We can make the design and quotation according to your require or your drawing |
Certification |
ISO9001:2000,CE. |
Designing Ability
Main Steel Structure building used parts:
1.H column and beam, C purlin and floor decking for main structure
2.Foundation bolt and high strength bolt are used to fasten the components
3.Wall panel and roofing panel: EPS or rock wool sandwich panel, or corrugated color steel
4.Skylight panel is used to day lighting
5.PVC window and steel door
6.Accessories, such as tie bar, brace, screws
Project Case:
Some main oversea projects we undertook in the last couple months
Industrial Warehouse (13000M2) Argentina
Warehouse (14000M2)----Republic of Uzbekistan
Workshop (12000M2)----Canada
Warehouse (3600M2)---Romania
Vegetable Market (2500M2)----Mauritius
Pig shed (3500M2)---USA
Chicken shed (2800M2) )------ Australia
Aircraft Hangar (1300M2)------Australia
Warehouse (900M2)----Mongolia
Prefabricated house (70M2)----800sets---Angola
Container house (20')-----60 sets South Africa
Packing and Shipping
Production Process
Quality Inspection
We strictly abide by the national container house production standards and absolutely guarantee product quality. Each batch of products must undergo strict testing before they can be shipped and delivered to customers.
Our Success Case
Our Exhibition
Customer Visit
Fixed packing, loading, transportation, unloading the matters needing attention:
(1) The lifting large there must be a person responsible for the use of fixture, suitable, strictly abide by the
rules of lifting, to prevent the occurrence of vibration, impact, deformation or damage, fall in the hoisting process.
(2) At the time of loading, there must be a special supervision, check car number and packing, the car pile
up securely, and to increase the necessary binding component loosening, prevent the loss.
(3) Remained stable in the transport process, the vehicle at the time of shipment, on the long, wide, high object transport, must be trained pilots, escort personnel responsible for, and mark is arranged on a vehicle.
(4) No rough handling, loading and unloading personnel handling, weight, size should be familiar with the components, and check the horse sling, rigging, prevent accidents.
(5) The member to the construction site, timely organization of unloading, stacking area.
(6) The crawler crane carrying member, should pay attention to the surrounding terrain, air condition, prevent the crawler crane overturning and component collision.