MOQ: | 1000 sqm |
Price: | USD 40-60 / sqm |
Standard Packaging: | Packed on steel pallet with fixture and loaded into 40'HQ/OT |
Delivery Period: | 6 weeks after shop drawing get approval |
Payment Method: | T/T,L/C |
Supply Capacity: | 100,000 sqm / month |
Attribute | Value |
---|---|
Warranty | 5 Years |
Maintenance Costs | Reduced |
Connection | Bolts |
Insulation | EPS, Glasswool, Rockwool, PU On Option |
Thickness Of Panel | 50mm, 75mm, 100mm, 150mm, 200mm, 250mm |
Using Life | 50 Years |
Product | Steel Structure |
Material Grade | Q355B, Q235B |
Design Load | Wind, Snow, Seismic |
Design software | PKPM, Tekla structures, CAD |
Sand blasting | Sa 2.5 |
The Modern Prefabricated Steel Building is designed for easy assembly and recyclability, making it ideal for industrial warehouses, offices, or residential use. This structure utilizes steel to create a robust load-bearing framework, known as the main frame, which consists of beams and columns.
The building features a comprehensive bracing system, including:
These elements work together with precision-engineered roof, wall, and floor systems to form a complete metal structure.
This modern prefabricated steel building offers a versatile and efficient solution for a variety of applications, combining strength, speed, and sustainability.
Products | Steel Structure Warehouse |
Frame type | Portal frame, multi-story frame |
Main frame | Hot-rolled or Welded H beam and column, Q355B steel |
Bracing components | Tie bar, staying bar, Horizontal bracing, Column bracing |
Cladding system | Sandwich panel with glass wool, rock wool, PU insulation, Corrugated color steel sheet |
Accessory | Ridge tile, trim, Gutter, Down pipe, skylight, clerestory |
Door | Roll up door, industrial section door, swing door, Sliding door |
Window | PVC window, aluminum window, metal louver |
1. Easy to assemble
Prefabricated steel components are installed on-site as per drawings: first steel columns with cross-bracing, followed by roof beams and horizontal bracing, and finally purlins and enclosures.
2. Cost-effectiveness
Its lightweight nature reduces foundation expenses, while rapid construction allows for earlier operation. Overall economic benefits surpass those of traditional concrete buildings.
3. Simplified construction with short timelines
Factory-manufactured components are assembled on-site, drastically shortening build time. A 4,000㎡ steel structure building can be installed in approximately 40 days.
4. Energy-efficient & eco-friendly
Corrugated color steel sheets and sandwich panels boast energy-saving properties. Dry construction avoids dust and pollution from concrete work, and steel's recyclability further reduces environmental impact.
1. Optimal column spacing
Using H-section steel columns and beams, column spacing directly influences steel usage and costs. Typically set at 6.8-9m for economic efficiency (adjustable for specific needs). Building height should align with functional requirements (e.g., equipment, human activity) and maintenance access.
2. Proper lighting & ventilation
Large-span, open interiors demand human-centric, energy-saving designs. For tall buildings, ground-floor operable windows serve as primary air inlets, paired with roof ventilators to efficiently address lighting and ventilation needs.
1. Shorter construction period
Prefabricated components require minimal on-site welding, making steel structure construction significantly faster than concrete builds.
2. More eco-friendly
Steel components are hoisted and spliced without water, reducing dust and pollution in surrounding areas.
3. Better cost performance
Faster construction cuts labor costs, with total expenses roughly 20-30% lower than traditional concrete buildings. Steel also offers greater durability.
4. Lighter structure
Lightweight metal walls and roofs—far lighter than brick-concrete alternatives—reduce overall weight, easing foundation loads.
Our steel structure buildings mainly use high-quality H-section steel, I-section steel, color steel plates and sandwich panels with reliable performance and durability.
Our products have passed ISO 9001 quality management system certification and CE certification to meet international standards and can be customized according to different market requirements.
The construction period depends on the size and complexity. Generally, a 4,000 square meter building can be completed in about 40 days due to prefabricated components.
Yes, we can customize the design, size, and configuration of steel structure buildings according to customers' specific usage scenarios and functional requirements.
We provide detailed installation drawings and instructions. For large projects, we can also send professional engineers to the site for guidance to ensure smooth installation.