• Shenyang iBeehive Technology Co., LTD.
    Michael Scofield
    You always can give me the best plan ,and it lets my customer feel great,i hope we can have another chance to cooperation
  • Shenyang iBeehive Technology Co., LTD.
    Amok
    Easy to talk with, very professional and fast service, the project quality is super good.
  • Shenyang iBeehive Technology Co., LTD.
    TIM
    Good Products ,Good Service,Good Sourcing Platform!
Contact Person : Kevin
Phone Number : +8613842071447
Whatsapp : +8613842071447

Q235 / Q345 Workshop Steel Structure Metal Structure Buildings Environmentally Friendly

Place of Origin shenyang
Brand Name ibeehive
Minimum Order Quantity 500 tons
Price US $800 - 1000
Packaging Details By clients requirement in 40'OT/ 40'HQ/ 40'GP/ 20'GP Containers.
Delivery Time Shipped in 30 days after payment
Supply Ability 5000 tons per month

Contact me for free samples and coupons.

Whatsapp:0086 18588475571

Wechat: 0086 18588475571

Skype: sales10@aixton.com

If you have any concern, we provide 24-hour online help.

x
Product Details
Product Heavy Structural Steel Fabrication Parts Name Structural Steel Fabrication
Material Carbon Steel, Stainless Steel Process Cutting, Assembling, Welding, Machining, Sandblasting, Painting
Size Up To Customer's Require Type Light
High Light

structural steel workshop

,

steel structure workshop

Leave a Message
Product Description

Q235 / Q345 Workshop Steel Structure Metal Structure Buildings Environmentally Friendly 

 
 
 
Pay attention
 

1. Strictly control the welding position of the relative position of size , welding pass behind the prospective;

 

2. Reasonablly selection of welding parameters and order to prevent crack;

 

3. Electrode required drying, welding area need to clean up, welding process, together with the appropriate welding current, decrease of welding speed, gas completely escape , prevent the formation of weld porosity;

 

4. When continuously multi-layer welding, each weld layer after cleaning, prevent the formation of slag;

 

5. Selection for current, avoid arc pull too long, control electrode angle and arc method, avoid the generation of undercut.

 

Attached: welding process parameters

 

welding process parameters

 

Materals(mm) Electrode diameter (mm) Welding current(A) Welding voltage(V) Welding speed(m/min)
<10 Ø3.2 200-250 30-38 0.2-0.3
10-20 Ø4.0 200-250 30-38 0.15-0.25
>30 Ø4.0 320-350 30-38 0.3-0.5
 
 
Materials department
 

" Steel Design Code" (GB50017-2003)

 

" Cold-formed steel structure technical specifications" (GB50018-2002)

 

" Construction Quality Acceptance of Steel" (GB50205-2001)

 

" Technical Specification for welded steel structure" (JGJ81-2002, J218-2002)

 

" Technical Specification for Steel Structures of Tall Buildings" (JGJ99-9)

 

China supplier the heavy steel structure


 

Trade Shows
 

China supplier the heavy steel structureChina supplier the heavy steel structureChina supplier the heavy steel structure

 
 
Installation Notice
 

1. Steel structure welding requirements

 

Engaged in welding of steel structure work welders must pass the examination and obtain a certificate. The holder welder must welding in its passing the examination and approval within the scope of the project.

 

2. Fastener connection requirements

 

Steel structure fabrication and installation of units should be in accordance with the provisions of the high strength bolts respectively connected with friction surface of the anti slip coefficient test and retest, component friction surface site should be dealt with separately anti slip coefficient test, the results should be consistent with design requirements.

 

3. Steel structure assembly and installation of steel structure requirements

 

(1)  of H type steel welding seam splicing spacing and the web of the seam shall not be less than 200 mm.

 

(2)  and crane beam crane truss installation in place should not be deflection.

 

(3)  multi section column installation, each column positioning ground control axis should lead directly, not from the axis of lower column guide, avoid too large error accumulation.

 

(4)  the steel grid structure after the completion of the total spell and roofing project should be finished respectively to measure the deflection, the deflection and the measured value of 1.15 times can't exceed the design value.

 

(5)  coating, coating times, coating thickness shall comply with the design requirements.

 

(6)  the thickness of coating coated thin type fireproof coating shall conform to the requirements of design about the fireproof limit.

 

4. Electric single girder crane technical parameters

 

LD - type A electric single girder bridge crane and CD1, MD1 type electric hoist necessary use, become a light rail running a small crane.

This product is a general purpose crane, for mechanical manufacturing, assembly workshop and warehouse and other places.

As with Motor Grab spreader, is handling and transportation of bulk goods. This product is suitable for lifting weight 1, 2, 3, 5, 10 tons, 22.5 meters span 7.5-.

The crane control mode with the ground (divided into wired and wireless two), control room control, for users to select.

This product is not flammable, explosive in the medium or large humidity with acid, alkali gases places of work, is not suitable for lifting and transporting molten metal, toxic and flammable work.

This product series is a series of products of electric single girder crane adopts the international advanced standard manufacturing. The machine has the advantages of novel structure, good technology, operation is flexible and stable, safe and reliable.

 

China supplier the heavy steel structure

 
Buying Guides
 

1. Dimension :Length , width, height, eave height , roof pitch .

 

2. Doors and windows :dimension , quantity , where to put them.

 

3. Local climate : Wind speed , snow load ,etc

 

4. insulation material :sandwich panel or steel sheet

 

5. Crane beam :Do you need crane beam &tons? inside the steel structure or outside ?

 

6. Is there any materials that are not allowed to imported into the country where the structure is planning to use ?

 

7. What is the founctions of the workshop? we must consider the wind and lighting inside.

 

 

Thanks for your carefully checking to our company products !!

 

Welcome you to viist our company produce ability and qulity ,We would like to

 

received your inquiry !!