products
PRODUCTS DETAILS
Home > Products >
Multi Story Hotel Office Steel Structure Building Fast Install Prefabricated Construction

Multi Story Hotel Office Steel Structure Building Fast Install Prefabricated Construction

MOQ: 1000 sqm
Price: USD 40-60 / sqm
Standard Packaging: Packed on steel pallet with fixture and loaded into 40'HQ/OT
Delivery Period: 6 weeks after shop drawing get approval
Payment Method: T/T,L/C
Supply Capacity: 100,000 sqm / month
Detail Information
Place of Origin
Shandong, China
Brand Name
TSIN
Certification
ISO, CE, SGS
Model Number
TSIN
Warranty:
5 Years
Maintenance Costs:
Reduced
Labor Costs:
Lower
Connection:
Bolts
Insulation:
EPS, Glasswool, Rockwool, PU On Option
Thickness Of Panel:
50mm, 75mm, 100mm, 150mm, 200mm, 250mm
Using Life:
50 Years
Product:
Steel Structure
Material Grade:
Q355B, Q235B
Structure Type:
Portal Frame
Design Load:
Wind, Snow, Seismic
Design Software:
PKPM, Tekla Structures, CAD
Sand Blasting:
Sa 2.5
Surface Treatment:
Anti-corrosive Paint Or Hot Dipped Galvanized
Highlight:

Hotel Steel Structure Building

,

Office Steel Structure Building

,

Prefabricated metal frame buildings

Product Description
Multi Story Hotel Office Steel Structure Building - Fast Install Prefabricated Construction
Product Attributes
Attribute Value
Warranty 5 Years
Maintenance Costs Reduced
Labor Costs Lower
Connection Bolts
Insulation EPS, Glasswool, Rockwool, PU On Option
Thickness Of Panel 50mm, 75mm, 100mm, 150mm, 200mm, 250mm
Using Life 50 Years
Material Grade Q355B, Q235B
Structure type Portal frame
Design Load Wind, Snow, Seismic
Design software PKPM, Tekla structures, CAD
Sand blasting Sa 2.5
Surface treatment Anti-corrosive paint or hot dipped galvanized
Modern Prefabricated Steel Building
Engineered for easy assembly and recyclability, our prefabricated steel buildings are ideal for industrial warehouses, offices, and residential projects. The high-quality steel forms a robust load-bearing framework with beams and columns as the main structural components.
Structural Components
  • Tie bars
  • Knee bracing
  • Stay bars
  • Column bracing
  • Horizontal bracing
These precision-engineered components work with roof, wall, and floor systems to create durable and stable metal structures.
Advantages Over Traditional Concrete Buildings
  • Enhanced Strength: Steel plates or sectional steel provide superior structural strength and improved seismic resistance
  • Faster Construction: Prefabricated components manufactured in factories enable quick on-site assembly
  • Sustainability: Reusable and recyclable steel reduces construction waste and environmental impact
Multi Story Hotel Office Steel Structure Building Fast Install Prefabricated Construction 0 Multi Story Hotel Office Steel Structure Building Fast Install Prefabricated Construction 1 Multi Story Hotel Office Steel Structure Building Fast Install Prefabricated Construction 2
Product Specifications
Products Steel Structure Warehouse
Frame type Portal frame, multi-story frame
Main frame Hot-rolled or Welded H beam and column, Q355B steel
Bracing components Tie bar, staying bar, Horizontal bracing, Column bracing
Cladding system Sandwich panel with glass wool, rock wool, PU insulation, Corrugated color steel sheet
Accessory Ridge tile, trim, Gutter, Down pipe, skylight, clerestory
Door Roll up door, industrial section door, swing door, Sliding door
Window PVC window, aluminum window, metal louver
Multi Story Hotel Office Steel Structure Building Fast Install Prefabricated Construction 3 Multi Story Hotel Office Steel Structure Building Fast Install Prefabricated Construction 4
Key Advantages of Steel Structure Buildings
  • Easy to Assemble: Prefabricated components installed according to detailed drawings
  • Cost-Effectiveness: Lightweight steel reduces foundation costs and enables earlier operation
  • Rapid Construction: 4,000㎡ structure can be installed in approximately 40 days
  • Energy-Efficient: Corrugated color steel sheets and sandwich panels offer excellent insulation
Design Considerations
  • Optimal Column Spacing: Typically 6.8-9m using H-section steel for columns and beams
  • Proper Lighting & Ventilation: Energy-efficient designs with operable windows and roof ventilators
Comparison with Concrete Buildings
  • Shorter Construction Period: Minimal on-site welding makes assembly significantly faster
  • Eco-Friendly: Dry construction reduces dust and pollution
  • Cost Performance: Total expenses approximately 20-30% lower than concrete buildings
  • Lighter Structure: Reduces foundation loads compared to brick-concrete alternatives
Multi Story Hotel Office Steel Structure Building Fast Install Prefabricated Construction 5 Multi Story Hotel Office Steel Structure Building Fast Install Prefabricated Construction 6
Frequently Asked Questions
What materials are used in your steel structure buildings?
Our buildings use high-quality H-section steel, I-section steel, color steel plates and sandwich panels with reliable performance and durability.
What certifications do your steel structure buildings have?
Our products have ISO 9001 quality management system certification and CE certification to meet international standards.
How long is the construction period?
A 4,000 square meter building can typically be completed in about 40 days due to prefabricated components.
Can steel structure buildings be customized?
Yes, we can customize design, size, and configuration according to specific usage scenarios and functional requirements.
Do you provide installation guidance?
We provide detailed installation drawings and instructions, with professional engineers available for large projects.