-
Prefabricated Steel Structures
-
Heavy Steel Structure
-
Warehouse Steel Structure
-
Workshop Steel Structure
-
Temporary Bailey Bridge
-
Steel Airplane Hangars
-
Steel Roof Trusses
-
Steel Structure Building
-
Prefab Warehouse
-
Corrugated Metal Roofing
-
Steel Floor Decking
-
Structural Steel Bridge
-
Multi Floor Building
-
Steel Frame Structure
-
Galvanized Steel Square Tubing
-
Michael ScofieldYou always can give me the best plan ,and it lets my customer feel great,i hope we can have another chance to cooperation
-
AmokEasy to talk with, very professional and fast service, the project quality is super good.
-
TIMGood Products ,Good Service,Good Sourcing Platform!
Professional Industrial Q235 Warehouse Steel Structure Prefabricated
Place of Origin | Shenyang |
---|---|
Brand Name | ibeehive |
Model Number | Workshop |
Minimum Order Quantity | 500 Tons |
Packaging Details | By clients requirement in 40'OT/ 40'HQ/ 40'GP/ 20'GP Containers. |
Delivery Time | Shipped in 30 days after payment |
Payment Terms | L/C, T/T, Western Union |
Supply Ability | 50000tons per year |

Contact me for free samples and coupons.
Whatsapp:0086 18588475571
Wechat: 0086 18588475571
Skype: sales10@aixton.com
If you have any concern, we provide 24-hour online help.
xStandard | ASTM,BS,DIN,GB,JIS | Grade | Q235, Q345 |
---|---|---|---|
Dimensions | 00 SQM To 100000 SQM | Size | As Customer's Require |
Type | Light/heavy | Transport | Sea Freight |
Application | Warehouse、Workshop | Main Steel | Q345, Q235, Q345B, Q235B Etc. |
High Light | q235 warehouse steel structure,industrial warehouse steel structure prefabricated,q235 prefabricated steel warehouse |
Professional Industrial Steel Structure Cheap Warehouse
Product Description
Steel structure building is made from welding H section steel as column and beam, some of them has crane beam, it's made from H steel beam too. Galvanized C,Z section steel as wall purlin and roof purlin, Its wall and roof are made of metal steel sheet or sandwich panel. The door is an electric shutter door or flat open door. The window is PVC or aluminum window. With the extensive use of steel structures, its advantages are increasingly significant compared with traditional buildings.
Advantages of steel structure building: steel structure warehouse
1) Cost saving and transportation convenient, custom design available steel building
2) The main beam and column are made of quality steel material Q355B Q345B Q235B steel structure workshop
3) Steel structure makes the house resist heavy wind of 180km/h and 9-grade earthquake steel structures
4) Easy assembly and disassembly several times without damage steel structure shed
5) Widely used in construction site, office building, dormitory etc. steel structures
6) Good environmental protection effect. Steel structure housing construction greatly reduces sand, stone and dosage of the ash.Most of the used materials are recyclable or degradable, little rubbish produced
Our Company
iBeehive is a professional manufacturer of steel structure, bridge with 23 years experience, finished 3520 projects total 17600000 sqm. We specialize in providing complete solutions including consulting, design, fabrication and erection of high-quality pre-engineered steel building and steel structure products.
We have 2 factories with a total area of 150000 m², iBeehive has served the pre-engineered building industry with the highly trained crews, specialized equipment, CWI inspector, and 20 professional design team.
Success Case
Industrial Warehouse (13000M2) Argentina
Warehouse (14000M2)----Republic of Uzbekistan
Workshop (12000M2)----Canada
Warehouse (3600M2)---Romania
Vegetable Market (2500M2)----Mauritius
Pig shed (3500M2)---USA
Chicken shed (2800M2) )------ Australia
Aircraft Hangar (1300M2)------Australia
Warehouse (900M2)----Mongolia
Prefabricated house (70M2)----800sets---Angola
Container house (20')-----60 sets South Africa
Products & Service
We supply completely steel structure building with Design& Engineering service: steel building, space frames, tubular steel
structures, basic building elements(built-up welded H-section, hot-rolled H-section, channel, steel column, steel beam), standard frames, secondary framing, roof &wall materials, tempcon (sandwich) panels window and doors.
Payment Terms:
1) Payment: T/T(30% prepaid as deposit, balance 70% before shipment) or L/C at sight
2) Delivery time: 15~40 days, as pre customers' order
3) Shipment Loading: 20"GP, 40"GP, 40"HQ, 40"OT or in bulk