-
Prefabricated Steel Structures
-
Heavy Steel Structure
-
Warehouse Steel Structure
-
Workshop Steel Structure
-
Temporary Bailey Bridge
-
Steel Airplane Hangars
-
Steel Roof Trusses
-
Steel Structure Building
-
Prefab Warehouse
-
Corrugated Metal Roofing
-
Steel Floor Decking
-
Structural Steel Bridge
-
Multi Floor Building
-
Steel Frame Structure
-
Galvanized Steel Square Tubing
-
Michael ScofieldYou always can give me the best plan ,and it lets my customer feel great,i hope we can have another chance to cooperation
-
AmokEasy to talk with, very professional and fast service, the project quality is super good.
-
TIMGood Products ,Good Service,Good Sourcing Platform!
200 Type Prefabricated Steel Bailey Bridge With Galvanized Or Painted Surface
Place of Origin | Shenyang |
---|---|
Brand Name | ibeehive |
Certification | ISO9001-2008 SGS CCIC |
Model Number | 200 |
Minimum Order Quantity | 1 set |
Price | Negotiable |
Packaging Details | Standard export seaworthy package, pallet or as required |
Delivery Time | Shipped in 1 month after payment |
Supply Ability | 20000 tons per month |
Contact me for free samples and coupons.
Whatsapp:0086 18588475571
Wechat: 0086 18588475571
Skype: sales10@aixton.com
If you have any concern, we provide 24-hour online help.
xStandard | ASTM GB BS | Material | Q345B/Q460C |
---|---|---|---|
Net Width | 4.2m | Single Span | 9-24m |
Surace Treatment | Painted/ Galvanized | Application | Civil Bridge |
High Light | modular bridge construction,temporary bridge construction |
200 Type Bailey Bridge With SS (Single Row Single Layer) Q345B prefabricated steel material
Bailey Bridge requires no special tools or heavy equipment for construction, the bridge elements are small enough to be carried in , and the bridge is strong enough to carry . It is considered a great example of military engineering.
ZB 200 panel bridge: ZB 200 panel bridge is similar to the compact 100 panel bridge from their appearance.
The difference is its increased panel height to 2.134m. It employed the method of alternating joints between Reinforcement Chords and the joints between panels.
This method can decrease inelastic deformation caused by the oversized pinholes. Pre-arch method is used to additionally cut down mid-span and vertical deflection to a larger degree.
Bolt-connected components use the orienting sleeve- fixing method to increase accuracy of connections.
Shear is created in orienting sleeves and tension is developed in bolts, which increase the usage life of the bolts and ensure the safety of panel bridges.
Wind resistant brace is made to be composite type and is connected to transom/girders to improve overall stability of panel bridges.
The part between braced frame and panels is fixed through bridging so as to prevent the whole bridge from side bending. After the erection, there will be a pre-arched degree over the span of the bridge. Besides it can be assembled into single-lane bridges. The compact 200 panel bridge can also be assembled into double lane bridge, hence it broadens its application range. It is suitable for the load designs of HS-15, HS-20, HS-25 and pedrail-50 etc.
The delivery situation: