• Shenyang iBeehive Technology Co., LTD.
    Michael Scofield
    You always can give me the best plan ,and it lets my customer feel great,i hope we can have another chance to cooperation
  • Shenyang iBeehive Technology Co., LTD.
    Amok
    Easy to talk with, very professional and fast service, the project quality is super good.
  • Shenyang iBeehive Technology Co., LTD.
    TIM
    Good Products ,Good Service,Good Sourcing Platform!
Contact Person : Kevin
Phone Number : +8613842071447
Whatsapp : +8613842071447

Prefab Metal Construction Steel Structure Bailey Bridge

Place of Origin Shenyang
Brand Name ibeehive
Certification AWS or equivalent
Model Number 200 TYPE
Minimum Order Quantity 1pc
Price US $1800-2000/Tons
Packaging Details 40' GP or customized
Delivery Time 200 tons per month
Payment Terms Western Union, L/C, T/T, MoneyGram
Supply Ability 200 tons per month

Contact me for free samples and coupons.

Whatsapp:0086 18588475571

Wechat: 0086 18588475571

Skype: sales10@aixton.com

If you have any concern, we provide 24-hour online help.

x
Product Details
Standard AISI, ASTM, BS, DIN, GB, JIS Grade Q345B-Q460C
Brand Name QHHK Type 200 Type
Application Steel Structure Bridge Surface Painting Or HDG
Package 40’ GP & HQ MOQ 1pc
Loading Port Dalian Port, China Supply Ability 10000 Tons/per Year
High Light

modular bridge construction

,

temporary bridge construction

Leave a Message
Product Description

High quality steel structure military bailey bridges for hot sale

 

Features

1. Speed construction- pre-engineered components

2. Easy - to handle, transport, assemble, install and reuse

3. Cost effective to own and re-use in different length bridges

4. Damaged parts can be easily and quickly replaced from stock

5. Made of steel with hardwoord for decking

6. All steel is precision CNC machined and laser cut components

7. Faithfully replicates the key component of the original Bailey Bridge, including the Panels, Transoms, Stringers,

Chesses, Ribands, Rakers, Bracing Frames, End Posts and Sway Braces.

8. Additional sections can be added to increase the length of the bridge

9. Additional panels can be added to create Double and Triple panel bridges.

10. Includes all fasteners, pins and bearings

11. Simple exploded view instructions

12. Sections can easily be separated for transport

 

Prefab Metal Construction Steel Structure Bailey Bridge 0

Prefab Metal Construction Steel Structure Bailey Bridge 1

About bailey bridge.

Bailey bridge is used when there is a need to cross an obstacle for a certain time period.This is often in case of military operations, during or after natural disasters replacement or renovation of consistent bridges or in unusually areas like the movie industry. Thereby the function also differs on differs on different users of the bridge which could be pedestrians, common vehicles(cars,busses,trucks),heavy military equipment (tank) or the railway.

 

 

 

 

Types 

Prefab Metal Construction Steel Structure Bailey Bridge 2

Type
Moudle
Lanes
width
Bridge Deck
Steel Grade
Corrosion
SS
3.042m
Single Lane/Double lane
4.2m/7.35m
steel
Q345B
Painting/Hot-dip Galvanized ASTM A123 BS EN ISO14713&1461
DS
3.042m
Single Lane/Double lane
4.2m/7.35m
steel
Q345B
Painting/Hot-dip Galvanized ASTM A123 BS EN ISO14713&1461
TS
3.042m
Single Lane/Double lane
4.2m/7.35m
steel
Q345B
Painting/Hot-dip Galvanized ASTM A123 BS EN ISO14713&1461
DD
3.042m
Single Lane/Double lane
4.2m/7.35m
steel
Q345B
Painting/Hot-dip Galvanized ASTM A123 BS EN ISO14713&1461
TD
3.042m
Single Lane/Double lane
4.2m/7.35m
steel
Q345B
Painting/Hot-dip Galvanized ASTM A123 BS EN ISO14713&1461

 

Compnents of bailey bridge

Prefab Metal Construction Steel Structure Bailey Bridge 3

Prefab Metal Construction Steel Structure Bailey Bridge 4

 

 

 

Prefab Metal Construction Steel Structure Bailey Bridge 5Prefab Metal Construction Steel Structure Bailey Bridge 6

 

Quality control

 

General fabrication main process of steel structure is divided into: material preparation →cutting→ assembling→ welding→ drilling → assembly → correction → shot blasting and rust removal → painting → number →component acceptance ex-factory. In the steel structure production, according to the steel structure production process flow, grasp the key processes for quality control, such as control of key parts processing, main components of the process, measures, processing equipment, process equipment, etc. Each processing part, we can have strict inspection specifications. Welding engineering is the most important link in steel structure fabrication and installation engineering.

For the welding, We have our qualified CWI welding inspector to control the quality according to AWS-D1.1/D1.5 welding quality system. Spot welding strictly weld according to ASW welding quality system.

 

Prefab Metal Construction Steel Structure Bailey Bridge 7Prefab Metal Construction Steel Structure Bailey Bridge 8

 

 

Prefab Metal Construction Steel Structure Bailey Bridge 9

Customer visit

Prefab Metal Construction Steel Structure Bailey Bridge 10

Attend exhibition

Prefab Metal Construction Steel Structure Bailey Bridge 11

FAQ

 

Q1: Can I have a visit to your factory before the order?
A: Why not? Welcome to visit our factory. You can fly to Shenyang Taoxian Airport, then we will pick you up at the airport, hotel booking service is available.

Q2: Do you supply installation service?
A: Yes, we do. But you will pay for our professional installation cost at your local place, then we will send the engineers to supervise it.

Q3: How long can the frame be used?
A: The use life of the main structure is the designed used life, usually is 50-100 years (standard request of GB)

Q4: How long is the use life of the roof cover?
A: The use life of the PE coating is usually 10-25 years. The use life of roof sun light sheet is shorter, usually 8-15 years

Q5: What is the anti-rust treatment for steel structure?
A: Anti-rust treatment of steel structure Normal anti-rust paint

Anti-rust paint with epoxy zinc primer
Hot-dip galvanization
Hop-dip galvanization + PU finish

Powder coating
Stainless steel structure: No. 301/304/316 stainless steel structure

Q6: How do we cooperate on certain project?
A: Firstly, please send us your project details and your requirements. Then we will design accordingly, free of charge. Afterwards, please check and confirm whether you like the drawings. If not, we shall get the drawings revised until your confirmation. Finally we make a deal.