• Shenyang iBeehive Technology Co., LTD.
    Michael Scofield
    You always can give me the best plan ,and it lets my customer feel great,i hope we can have another chance to cooperation
  • Shenyang iBeehive Technology Co., LTD.
    Amok
    Easy to talk with, very professional and fast service, the project quality is super good.
  • Shenyang iBeehive Technology Co., LTD.
    TIM
    Good Products ,Good Service,Good Sourcing Platform!
Contact Person : Kevin
Phone Number : +8613842071447
Whatsapp : +8613842071447

Prefab Industrial Buildings Steel Portal Frame Structure Prefabricated Warehouse

Place of Origin Shenyang
Brand Name ibeehive
Model Number Workshop
Minimum Order Quantity 500 square meter
Price $49-79/square meter
Packaging Details By clients requirement in 40'OT/ 40'HQ/ 40'GP/ 20'GP Containers.
Delivery Time Shipped in 30 days after payment
Payment Terms L/C, T/T, Western Union
Supply Ability 50000tons per year

Contact me for free samples and coupons.

Whatsapp:0086 18588475571

Wechat: 0086 18588475571

Skype: sales10@aixton.com

If you have any concern, we provide 24-hour online help.

x
Product Details
Standard ASTM,BS,DIN,GB,JIS Grade Q235, Q345
Dimensions 00 SQM To 100000 SQM Size As Customer's Require
Type Light/heavy Transport Sea Freight
Application Warehouse、Workshop
High Light

q235 steel structure workshop

,

q235 prefab workshop buildings

,

ASTM steel structure workshop

Leave a Message
Product Description

China Prefabricated Construction Steel Structure Q235 Workshop Structural Steel Fabrication Commercial Steel Structures

Steel structure warehouse is mainly refers to the main bearing component is composed of steel. Including the steel columns, steel beam, steel structure, steel roof truss.Each component using welds, bolts or rivets to connect.

 

The roof and wall can be made of composite panel or veneer. Galvanized sheet metal can prevent rust and corrosion. The use of self-tapping screw can make the connection between the plates more closely, to prevent leakage. You can also use composite panel for roof and wall. The sandwich is polystyrene, glass fiber, rock wool, polyurethane. They have good thermal insulation, heat insulation, fire-retardant. The wall of the steel structure maintenance also can use brick wall. The cost of a brick wall is higher than galvanized steel roof and wall.

 

The usage scale includes large-scale workshop, or warehouse, supermarkets, entertainment centers and modular steel structure garage.

 

TEMS   SPECIFICATION
Main Steel Frame Colum Q235,Q355 Welded H Section Steel
Beam Q235,Q355 Welded H Section Steel
Secondary Frame Purlin Q235 C and Z purlin
Knee brace Q235 Angle Steel
Tie Rod Q235 Circular Steel Pipe
Brace Q235 Round Bar
Vertical and Horizontal Support Q235 Angle Steel, Round Bar or Steel Pipe
Maintenance System Roof Maintenance System Roof Panel (EPS/Fiber Glass Wool/Rock Wool/PU Sandwich Panel or Steel Sheet Cover) and Accessories
Hygiene system Toilet and Shower Unit( Dry wet separation promise service life,The toilet will be suggested and provided as the brand you want with the best quality and low cost.
Wall Maintenance System Wall Panel (EPS/Fiber Glass Wool/Rock Wool/PU Sandwich Panel/Wooden plastic plate or PVC wall panel Cover)and Accessories
Window System Aluminum Alloy Window/ PVC Window/Screen window
Door System Steel wooden door/PVC Door/Alluminum alloy sliding door/Doble-open sliding door etc.
Others PVC/Aluminum Rainspout,Gutter etc.

Prefab Industrial Buildings Steel Portal Frame Structure Prefabricated Warehouse 0


Main Material

Prefab Industrial Buildings Steel Portal Frame Structure Prefabricated Warehouse 1Prefab Industrial Buildings Steel Portal Frame Structure Prefabricated Warehouse 2Prefab Industrial Buildings Steel Portal Frame Structure Prefabricated Warehouse 3

Our Company

iBeehive is a professional manufacturer of steel structure, bridge with 21 years of experience, finished 3520 projects total 17600000 sqm. We have 2 modern factories with a total area of 80000+ sqm, Ibeehive has served the pre-engineered building industry with the highly trained crews, specialized equipment, CWI inspector, and the team of professional engineers.

Our factories are among the largest and most advanced steel structure production facilities in the world.Ibeehive specializing in providing complete solutions including consulting, design, fabrication and erection of high-quality pre-engineered steel building and steel structure products.The international quality system ISO 9001:2008, ISO 14001:2004, OHSAS 18001:2007 AWS-D1.1/D1.5 and CWI inspector help us to keep our quality every time.

We provide customers with full steel structures such as factory, warehouse, high-rise building, heavy industry, shopping mall, exhibition centers, infrastructure (railway stations, airports^), a variety of steel structure projects such as PNG stadium, Qatar Warehouse, Feiji Logistic Park, Japan Cowshed etc.Our Purpose is to help customers deliver their projects more quickly, safely and efficiently. We achieve this by providing our value-adding engineering expertise, services and products in the right way to our customers.

Prefab Industrial Buildings Steel Portal Frame Structure Prefabricated Warehouse 4

Success Case

Prefab Industrial Buildings Steel Portal Frame Structure Prefabricated Warehouse 5

 

------ Why Choose Us -------

 

1.Designing Ability

Almost all of two story steel structure warehouse is customized. Our engineer design it according to local wind speed, rain load, size of this steel structure warehouse ( length*width*height) and does it have other special accessories, like crane, roof fans, skylight panel, etc.? Or we following your drawings.

Prefab Industrial Buildings Steel Portal Frame Structure Prefabricated Warehouse 6

 

2.Producing and Manufaturering by Ourselve.

We purchase the best quality raw material from An steel Co., Ltd.
We have 2 modern factories with a total area of 21000 square meters to produce.

Prefab Industrial Buildings Steel Portal Frame Structure Prefabricated Warehouse 7

 

3. Visualization of the Production Process

We can provide you with picture information of all production links, from raw materials to steel processing, the whole process of visual production. We have professional welding team, who are well educated and have welding cerfiticate, most important is that they all have over 21 years working experiences.

Prefab Industrial Buildings Steel Portal Frame Structure Prefabricated Warehouse 8

4. Strict Quality Inspection
With good quality steel material, we have AWS-D1.1/D1.5 welding quality system and professional CWI welding inspector to ensure high quality of the product.

Prefab Industrial Buildings Steel Portal Frame Structure Prefabricated Warehouse 9

5. About the installation problems:

There are 3 options of installation as following:

1. Clients install it by themselves according our drawings and simple video.

2. Our engineer to help on construction site.

3. We provide installation team to help.

Prefab Industrial Buildings Steel Portal Frame Structure Prefabricated Warehouse 10

 

6. Packing and Delivery

Steel Structure fixed packing, loading, transportation, unloading the matters needing attention:

(1) The lifting large there must be a person responsible for the use of fixture, suitable, strictly abide by the

rules of lifting, to prevent the occurrence of vibration, impact, deformation or damage, fall in the hoisting process.

(2) At the time of loading, there must be a special supervision, check car number and packing, the car pile

up securely, and to increase the necessary binding component loosening, prevent the loss.

(3) Remained stable in the transport process, the vehicle at the time of shipment, on the long, wide, high object transport, must be trained pilots, escort personnel responsible for, and mark is arranged on a vehicle.

(4) No rough handling, loading and unloading personnel handling, weight, size should be familiar with the components, and check the horse sling, rigging, prevent accidents.

(5) The member to the construction site, timely organization of unloading, stacking area.

(6) The crawler crane carrying member, should pay attention to the surrounding terrain, air condition, prevent the crawler crane overturning and component collision.

Prefab Industrial Buildings Steel Portal Frame Structure Prefabricated Warehouse 11

Prefab Industrial Buildings Steel Portal Frame Structure Prefabricated Warehouse 12