• Shenyang iBeehive Technology Co., LTD.
    Michael Scofield
    You always can give me the best plan ,and it lets my customer feel great,i hope we can have another chance to cooperation
  • Shenyang iBeehive Technology Co., LTD.
    Amok
    Easy to talk with, very professional and fast service, the project quality is super good.
  • Shenyang iBeehive Technology Co., LTD.
    TIM
    Good Products ,Good Service,Good Sourcing Platform!
Contact Person : Kevin
Phone Number : +8613842071447
Whatsapp : +8613842071447

200 Type Prefabricated Steel Bailey Bridge With Galvanized Or Painted Surface

Place of Origin Shenyang
Brand Name ibeehive
Certification ISO9001-2008 SGS CCIC
Model Number 200
Minimum Order Quantity 1 set
Price Negotiable
Packaging Details Standard export seaworthy package, pallet or as required
Delivery Time Shipped in 1 month after payment
Supply Ability 20000 tons per month

Contact me for free samples and coupons.

Whatsapp:0086 18588475571

Wechat: 0086 18588475571

Skype: sales10@aixton.com

If you have any concern, we provide 24-hour online help.

x
Product Details
Standard ASTM GB BS Material Q345B/Q460C
Net Width 4.2m Single Span 9-24m
Surace Treatment Painted/ Galvanized Application Civil Bridge
High Light

modular bridge construction

,

temporary bridge construction

Leave a Message
Product Description

200 Type Bailey Bridge With SS (Single Row Single Layer) Q345B prefabricated steel material

 
Product Description:
 

Bailey Bridge requires no special tools or heavy equipment for construction, the bridge elements are small enough to be carried in , and the bridge is strong enough to carry . It is considered a great example of military engineering.

 

ZB 200 panel bridge: ZB 200 panel bridge is similar to the compact 100 panel bridge from their appearance.

The difference is its increased panel height to 2.134m. It employed the method of alternating joints between Reinforcement Chords and the joints between panels.

This method can decrease inelastic deformation caused by the oversized pinholes. Pre-arch method is used to additionally cut down mid-span and vertical deflection to a larger degree.

Bolt-connected components use the orienting sleeve- fixing method to increase accuracy of connections.

Shear is created in orienting sleeves and tension is developed in bolts, which increase the usage life of the bolts and ensure the safety of panel bridges.

Wind resistant brace is made to be composite type and is connected to transom/girders to improve overall stability of panel bridges.
The part between braced frame and panels is fixed through bridging so as to prevent the whole bridge from side bending. After the erection, there will be a pre-arched degree over the span of the bridge. Besides it can be assembled into single-lane bridges. The compact 200 panel bridge can also be assembled into double lane bridge, hence it broadens its application range. It is suitable for the load designs of HS-15, HS-20, HS-25 and pedrail-50 etc.

 

The delivery situation:

 

200 Type Prefabricated Steel Bailey Bridge With Galvanized Or Painted Surface 0200 Type Prefabricated Steel Bailey Bridge With Galvanized Or Painted Surface 1200 Type Prefabricated Steel Bailey Bridge With Galvanized Or Painted Surface 2200 Type Prefabricated Steel Bailey Bridge With Galvanized Or Painted Surface 3