Home ProductsWorkshop Steel Structure

Light Metal ASTM Prefab Steel Workshop Q235 Q345

Light Metal ASTM Prefab Steel Workshop Q235 Q345

Light Metal ASTM Prefab Steel Workshop Q235 Q345
Light Metal ASTM Prefab Steel Workshop Q235 Q345
Light Metal ASTM Prefab Steel Workshop Q235 Q345
Product Details:
Place of Origin: Shenyang
Brand Name: ibeehive
Model Number: Workshop
Payment & Shipping Terms:
Minimum Order Quantity: 500 Tons
Packaging Details: By clients requirement in 40'OT/ 40'HQ/ 40'GP/ 20'GP Containers.
Delivery Time: Shipped in 30 days after payment
Payment Terms: L/C, T/T, Western Union
Supply Ability: 50000tons per year
Contact Now
Detailed Product Description
Standard: ASTM,BS,DIN,GB,JIS Grade: Q235, Q345
Dimensions: 00 SQM To 100000 SQM Size: As Customer's Require
Type: Light/heavy Transport: Sea Freight
Application: Warehouse、Workshop
High Light:

prefab steel workshop Q235

,

prefab steel workshop Q345

,

ASTM prefab metal workshop

Steel structure building warehouse workshop hangar commercial and farm buildings for sale

 

 

Main steel frame

H section steel beam and columns, painted or galvanized, galvanized C section or steel pipe

Secondary frame

hot dip galvanized C purlin , steel bracing , tie bar , knee brace , edge cover etc.

Roof panel

EPS sandwich panel , glass fiber sandwich panel , rock wool sandwich panel , and PU sandwich panel or steel sheet

Wall panel

Sandwich Panel or Corrugated Steel Sheet

Tie Rod

Circular Steel Tube

Brace

Round Bar

Knee Brace

Angle Steel

Roof Gutter

Color Steel Sheet

Drawing

We can make the design and quotation according to your require or your drawing

Certification

ISO9001:2000,CE.

Light Metal ASTM Prefab Steel Workshop Q235 Q345 0

Light Metal ASTM Prefab Steel Workshop Q235 Q345 1

Designing Ability

Light Metal ASTM Prefab Steel Workshop Q235 Q345 2

 

Main Steel Structure building used parts:
1.H column and beam, C purlin and floor decking for main structure
2.Foundation bolt and high strength bolt are used to fasten the components
3.Wall panel and roofing panel: EPS or rock wool sandwich panel, or corrugated color steel
4.Skylight panel is used to day lighting
5.PVC window and steel door
6.Accessories, such as tie bar, brace, screws

Light Metal ASTM Prefab Steel Workshop Q235 Q345 3

Project Case:

Some main oversea projects we undertook in the last couple months

Industrial Warehouse (13000M2) Argentina

Warehouse (14000M2)----Republic of Uzbekistan

Workshop (12000M2)----Canada

Warehouse (3600M2)---Romania

Vegetable Market (2500M2)----Mauritius

Pig shed (3500M2)---USA

Chicken shed (2800M2) )------ Australia

Aircraft Hangar (1300M2)------Australia

Warehouse (900M2)----Mongolia

Prefabricated house (70M2)----800sets---Angola

Container house (20')-----60 sets South Africa

Light Metal ASTM Prefab Steel Workshop Q235 Q345 4

Packing and Shipping

Light Metal ASTM Prefab Steel Workshop Q235 Q345 5

Production Process

Light Metal ASTM Prefab Steel Workshop Q235 Q345 6

Quality Inspection

We strictly abide by the national container house production standards and absolutely guarantee product quality. Each batch of products must undergo strict testing before they can be shipped and delivered to customers.

Light Metal ASTM Prefab Steel Workshop Q235 Q345 7

Our Success Case

Light Metal ASTM Prefab Steel Workshop Q235 Q345 8

Our Exhibition

Light Metal ASTM Prefab Steel Workshop Q235 Q345 9

Customer Visit

Light Metal ASTM Prefab Steel Workshop Q235 Q345 10

 

Fixed packing, loading, transportation, unloading the matters needing attention:

(1) The lifting large there must be a person responsible for the use of fixture, suitable, strictly abide by the

rules of lifting, to prevent the occurrence of vibration, impact, deformation or damage, fall in the hoisting process.

(2) At the time of loading, there must be a special supervision, check car number and packing, the car pile

up securely, and to increase the necessary binding component loosening, prevent the loss.

(3) Remained stable in the transport process, the vehicle at the time of shipment, on the long, wide, high object transport, must be trained pilots, escort personnel responsible for, and mark is arranged on a vehicle.

(4) No rough handling, loading and unloading personnel handling, weight, size should be familiar with the components, and check the horse sling, rigging, prevent accidents.

(5) The member to the construction site, timely organization of unloading, stacking area.

(6) The crawler crane carrying member, should pay attention to the surrounding terrain, air condition, prevent the crawler crane overturning and component collision.

Contact Details
Shenyang iBeehive Technology Co., LTD.

Contact Person: Peter

Tel: 8613804050369

Send your inquiry directly to us (0 / 3000)

Other Products